GENERAL COMMITTEE MEETING AGENDA 12 OCTOBER 2020
general as well as the target areas. However, Airservices’ decision to only consider
varying its final design from its proposed design where suggested alternatives were
aligned to the EIS concept paths meant that “consultation” with those in the general area
was effectively consultation in name only. The complaints to the ANO demonstrate that
public anger continued to grow through the process and remained after the consultation
period had closed.
9.8 There was never any realistic prospect that residents in the general area, despite the
chance to provide their feedback, had any significant opportunity to influence the
proposed flight paths. This quickly became apparent to them during the process and was
the fundamental basis of the complaints to the ANO”.9 (my emphasis)
The Aircraft Noise Ombudsman made two recommendations to the ASA board, namely:
Recommendation 1
Airservices should develop a framework for third party proposed changes that:
(a) provides robust and dependable governance arrangements to manage its early and
ongoing engagement with third parties
(b) establishes clear lines of accountability and documents these arrangements as they
evolve
(c) ensures an effective consultative process, which includes monitoring the adequacy of
any third party consultations being relied on.
Recommendation 2
Airservices should, as soon as practicable, design an effective post-implementation review
(PIR) process for the Sunshine Coast flight path designs, that does not perpetuate design
constraints requiring alignment with EIS concepts, and which encompasses:
(a) consideration of identified community-suggested alternatives
(b) a community engagement process that provides for genuine opportunities for
community contributions to influence decisions
(c) application of the latest version of Airservices’ National Operating Standard (NOS)
Environmental Management of Changes to Aircraft Operations (AA-NOS-ENV-2.100).
On 25 June 2020, the ASA board announced that it accepted the two recommendations.
The first of the recommendations focuses on arrangements between ASA and its client
airports about roles and responsibilities for future reviews of this nature. This is not something
that will impact upon the current flight paths for Sunshine Coast but, if properly implemented,
could reduce confusion for future reviews undertaken at other airports.
Of more interest is recommendation two which is discussed further below.
3. Proposed post-implementation review and next steps for Council
ASA have committed to undertaking a post-implementation review (PIR) in response to the
ANO recommendations.
The scope and process to be used in the PIR will be the subject of a terms of reference. This
is the key to ensuring that the PIR is undertaken in a fair and proper manner.
9 refer to paragraphs 9.6 and 9.8 of the ANO report – pages 28 and 29
Page 81 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.