Built form
9. The cantilevered deck is limited to a maximum width of 3 metres seaward of the Coastal
Building Line. No ancillary building works including swimming pools, retaining walls and
landscaped terraces are to be established seaward of the Coastal Building Line.
10. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment.
11. Gates must not be installed along the eastern property boundary to gain direct access to the
beachfront.
Performance Bond
12. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works.
Stormwater Drainage
13. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be carried out
generally in accordance with drawing number S18/003 P prepared by Westera Partners
dated February 2018 and The Stormwater Management Report reference Job No S18-003
prepared by Westera Partners dated 3 April 2018.
14. The stormwater management system must be maintained by the property owner in
accordance with The Stormwater Management Report reference Job No S18-003 prepared
by Westera Partners dated 3 April 2018.
Easements
15. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
16. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
17. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
18. The development must be constructed in accordance with the recommendations of the Slope
and Stability Assessment and Geotechnical Report Project number 1-20119 prepared by Soil
Surveys dated March 2018.
19. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with conditions of this permit and that the
development has a minimum factor of safety against landslip of 1.5 in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
20. Earthworks and retaining works carried out on site must not affect the structural integrity of
any of the buildings and/or lands and/or structures that border the development site. Fences
that are affected shall be replaced prior to the Building Certifier issuing the Certificate of
Classification.
Page 3 of 7
Document Set ID: 20593167
Version: 3, Version Date: 04/06/2018 Print Date: 4 June 2018, 10:10 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Council DA Decision Notice - CCB31435-10A9-417B-A5FD-7E0B3B229384.pdfRelated documentApplication case desk ↗
About this file
- File size
- 11.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.