Council DA Decision Notice - CCB31435-10A9-417B-A5FD-7E0B3B229384 · MCU18/0013.01

Attached to the e-mail Change to Detached House - MCU18/0013.01.

of 18

Text shows just the words. Original shows the document exactly as it was published.

Very large file (11.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Noosa Council documents




               21.    All fill, associated batters and retaining structures (both above ground and below ground)
                      must be contained entirely within the subject site unless written permission from the
                      respective landowner(s) is provided to Council. All earthworks must be undertaken in
                      accordance with the provisions of Australian Standard AS3798: Guidelines on Earthworks
                      for Commercial and Residential Developments.
               22.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Construction Management Plan
               23.    A Construction Management Plan must be submitted to and approved by Council prior to the
                      issue of the Building Permit. The plan must include but not be limited to the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased
                              iii.     proposed fencing to the site during the construction phase of the development
                              iv.      provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
                      f.      details on the location of external fill/dump sites/sources, the haulage route, type of
                              vehicle to be utilised during filling operations and frequency of usage. NB any damage
                              to the existing road system as a result of haulage operations shall be fully repaired at
                              the applicant’s expense
                      Damage to Services and Assets
               24.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               5.     REFERRAL AGENCIES

               Not applicable.




                                                                                                           Page 4 of 7
Document Set ID: 20593167
Version: 3, Version Date: 04/06/2018                                                                   Print Date: 4 June 2018, 10:10 AM

Used in these records

About this file

File size
11.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Council DA Decision Notice - CCB31435-10A9-417B-A5FD-7E0B3B229384.pdf · 11.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.