Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-12-11 Planning & Environment Committee Agenda

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   11 DECEMBER 2018




                                                       Page 39 of 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 11 DECEMBER 2018

   6.     Qualifications

   6.1.   The Report

            This report has been prepared by Omtrek Pty Ltd for the client based on an agreed scope
            of work and to provide advice m relation to relaxation of the coastal building line at
            Sunshine Beach.

            Omtrek Pty. Ltd. exercises allreasonable skilland care in the provision ofits professional
            services.  Our analysis and overall approach has been specifically catered for the
            particular requirements of the client and may not be applicable beyond this scope. For
            this reason, any other third parties are not authorised to utilise this report without further
            input and advice from Omtrek Pty. Ltd.
            Omtrek Pty. Ltd. is not responsible and will not be liable to any other parties for or in
            relation to any matter dealt within this report, or for any loss or damage suffered by any
            other parties arising from matters dealt with or conclusions expressed in this report. Other
            parties should not rely upon the report or the accuracy or completeness of any
            conclusions and should make their own inquiries and obtain independent advice in
            relation to such matters.

            Except where expressly stated, Omtrek Pty Ltd has not verified the validity or accuracy
            ofany information supplied to Omtrek Pty Ltd by the client or other parties for this report.

   6.2.   Limitations, Qualifications and Reservations

            This report has been prepared specifically to provide justification for a relaxation of the
            coastal building line at Sunshine Beach, Noosa.
            The report is based on the following studies and information prepared by others:
            1.  BMT WBM (2013), “Coastal Processes Study for the Sunshine Coast”
            2.  Design drawings supplied by the client
            The accuracy ofthe report is dependent upon the accuracy of this information.

            Paul  eb                             RPEQ
            / Vj

            Director (Coastal Engineering)
            Omtrek Pty Ltd

                                                                                        Page 39 of 72
Log in to download the original file

2018-12-11 Planning & Environment Committee Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.