Energex Referral Response - 115 Eumumdi Noosa Rd, Noosaville
Attached to the e-mail Energex Advice Agency Response - MCU25/0099.
2
100m of a substation site or subject to an easement for
the benefit of a distribution entity under the Electricity Act
and the easement is for a supply network
Impacted Electrical Tewantin (TWT) 33kV Substation, Easement A on
Infrastructure SP310728 – U/G 11kV Cable (ID: TWT12A), Easement
B on SP216066 – U/G 11kV Cables (ID: TWT5B,
TWT6B)
Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:
Component of Advice Agency direction
Development
MCU ☐ S56(1)(b)(i) – approval subject to stated development
conditions
In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act
2016.
Table 1
Plans forming part of this Approval
Title Plan No. Issue Date
Site Plan - - Received
Sheet 1 of 1 11/09/2025
(amended in red by
Energex)
Table 2
Condition Timing Purpose/Reason
1 Carry out the approved At all times To ensure the
development generally in development is
accordance with the carried out generally
approved plans and in accordance with
documents outlined within the plans of
Table 1 of this approval development
and the following: submitted within the
application
The specifications,
facts and
circumstances as
set out in the
development
application
submitted to
Energex; and
Where a
discrepancy or
conflict exists
between the
Have you seen our fact sheets?
See the ‘considerations when developing around electricity infrastructure’ section of our website
www.energex.com.au/referralagency