Energex Referral Response - 115 Eumumdi Noosa Rd, Noosaville

Attached to the e-mail Energex Advice Agency Response - MCU25/0099.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                    3




                 written conditions
                 of the approval and
                 the approved
                 plans, the
                 requirements of the
                 written conditions
                 prevail
 2       Any alterations to the plans     At all times                         To ensure the
         and document(s) identified                                            development is
         within Table 1 of this                                                carried out generally
         response are to be                                                    in accordance with
         resubmitted to Energex for                                            the plans of
         comment                                                               development
                                                                               submitted within the
                                                                               application

General Advice:

        Compliance with the Electrical Safety Act 2002, including any Code of Practice
         under the Act and the Electrical safety Regulation 2013 including any safety
         exclusion zones defined in the Regulation is mandatory

         Should any doubt exist in maintaining the prescribed clearance to the overhead
         conductors and electrical infrastructure then the applicant is obliged under the
         Act to seek advice from Energex.

        Any costs incurred by Energex as a result of the works on the easement are to
         be met by the property Developer / owner.

        This response does not constitute an approval to commence any works within
         the easement. Consent to commence works relevant to the conditions of the
         easement is required. All works on easement (including but not limited to
         earthworks, drainage and detention basins, road construction, underground and
         overhead services installation) require detailed submissions, assessment, and
         consent (or otherwise) by Energex.

        All works proposed to be undertaken in close proximity to overhead or
         underground electrical lines are to be undertaken in accordance with Energex’s
         Works Practice Manual WP1323. This document refers to various standards,
         guidelines, calculations, legal requirements, technical details, and other
         information relevant to working near high voltage infrastructure. A copy of
         WP1323 can be found online via Energex’s document library (Document library
         | Energex).

Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected] faithfully,


Harriet Veal
Town Planner


                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency
Log in to download the original file

Energex Referral Response - 115 Eumumdi Noosa Rd, Noosaville.pdf · 169 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.