ORDINARY MEETING MINUTES 19 MAY 2022
Stormwater Drainage
19. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
C. Advise the applicant to remove the demountable building (the former exchange building)
or obtain building approval within 90 days of the date of this approval.
D. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal is minor in nature and is co-located within a site with existing
telecommunication facilities.
2. The proposal can be conditioned to comply with the amenity and character
elements sought by the Overall Outcomes in the Noosa Plan 2020.
Carried unanimously.
7 OPW22/0029 DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
(PRESCRIBED TIDAL WORKS – NOOSA RIVER OYSTER HABITAT RESTORATION) FOR
NOOSA RIVER
Council Resolution
Moved: Cr Jurisevic
Seconded: Cr Wegener
That Council note the report by Coordinator Engineering to the General Committee Meeting
dated 16 May 2022 regarding Application No. OPW22/0029 for Operational Works (Prescribed
Tidal Works – Noosa River Oyster Habitat Restoration for Noosa River and
A. Approve the application in accordance with Referral Agency Conditions provided by
SARA on 7 April 2022 and the following conditions:
Approved Plans
1. Phase 1 – Pilot Phase is only approved as part of this development approval.
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
NROR-2021-00 A General Notes & Site Selection 09/07/2021
NROR-2021-01 - Restoration Zones 20/05/2021
NROR-2021-02 A Module Designs 09/07/2021
NROR-2021-03 A Goat Island Restoration Site 09/07/2021
NROR-2021-04 A Tewantin Island Restoration Site 09/07/2021
NROR-2021-05 A Noosa Sound West Restoration Site 09/07/2021
NROR-2021-06 A Noosa Sound East Restoration Site 09/07/2021
Currency Period
3. The development approval lapses if the works have not been substantially started
by 19 May 2024, unless an application to extend the currency period is approved
by Council.
General Conditions
4. All works must be undertaken in accordance with the Noosa Oyster Restoration
Project – Project Restoration Plan prepared by The Nature Conservancy dated
January 2022.
Page 14 of 20