Skip to the record
Accept no imitations.

Original source · versioned page text

Cooroy RV Stopover-Flood Bushfire Hazard-Management Plan_FINAL

Attached to the e-mail MCU15/0003 Amended Disaster Management Plan.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1          COOROY RV STOPOVER – CONTEXT

1.1    Purpose

The purpose of this plan is to document preparation and response for an east coast low, flooding, cyclone or fire
incident impacting on Council’s RV Stopover Area at Cooroy.

Responsibility for implementing the plan rests with Noosa Council business area charged with management of
Council’s commercial caravan parks and campgrounds and the Cooroy RV Stopover Caretaker,

1.2    Introduction

The RV Stopover area is located within part of Lot 1 SP242414, 17 Mary River Road, Cooroy – refer Attachment 1.

The RV Stopover area will utilise the fully cleared part of the lot as shown below comprising approx. 2.1 hectares of
the 16.34 ha site.




The use involves the parking of fully self-contained motorhomes and caravans for short term stays (maximum 4
nights).

There will be no fixed structures for accommodation or other purposes.

The site is bounded by:

a)       Cleared community use land utilised by the Cooroy Pony Club to the west;
b)       Fully cleared sewerage waste treatment plant facility to the north west;
c)       Residential and industrial uses to the south;
d)       Industrial uses to the east; and
e)       The remnant land to the north comprising natural bushland.



                                                                                             3 March 2015
       4
Log in to download the original file

Cooroy RV Stopover-Flood Bushfire Hazard-Management Plan_FINAL.pdf · 542 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.