Log in to see the plans as drawn2 RISKS TO RV STOPOVER AREA USERS
2.1 Flooding
The area is subject to flooding from Cooroy Creek which is to the east and drains through the remnant bushland to
north. Cooroy Creek forms part of the Six Mile Creek catchment that flows into the greater Mary River catchment.
Cooroy Creek receives run-off from an intermittent stream (essentially an open drain) that crosses the north-west
corner of the RV Stopover site as per map below (blue line denotes waterways).
As part of the application for Material Change of Use, hydrology & water consultants were engaged to assess
potential flood impacts on the site for events of varying recurrence intervals – refer Dwgs 1-5 Attached.
The drawings demonstrate impacts for:
a) ARI – 2 yr
b) ARI – 10 yr
c) ARI - 100 yr
d) ARI - 500 yr
e) ARI - 2,000 yr
f) ARI – Peak 9999 yr
The likelihood of an event occurring in Annual Recurrency Interval (ARI) is:
A – Almost Certain ARI 1
B – Likely ARI 10
C – Possible ARI 50
D – Unlikely ARI100
E – Rare ARI500
3 March 2015
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.