Cooroy RV Stopover-Flood Bushfire Hazard-Management Plan_FINAL
Attached to the e-mail MCU15/0003 Amended Disaster Management Plan.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnThe flood information indicates that during a 2yr ARI the northern section of the site will be subject to inundation.
This part of the site can be closed off as a gate will be provided to the access culvert and the site is effectively
separated into 2 sections with large boulders separating the area. There is an area to the south that would allow
for safe congregation in the event that the rainfall event and stream rises were easing. However, while the site has
sealed access, the parking area is grassed. Notwithstanding the potential for flooding due to stream rises, it is most
likely that in order to prevent damage to the ground surface, that the area will be closed for most of the “wet”
season if average or above average rainfall occurs.
2.2 Bushfire
The northern part of the proposed RV Stopover area is included as a “medium” hazard under the Noosa Plan –
Natural Hazard Bushfire Overlay.
Bushfire risk has not been assessed.
No open fires are permitted at the site at any time.
The threat would come from the north and not impact safe egress from the site.
As the site is within the urban footprint of Cooroy, it is expected that emergency services would provide direction if
a threat was evident.
3 March 2015
6