Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Appendix F - SBSMP

of 57

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (11.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 36, section 1. The text section number identifies this passage in the reader.

NOOSA PLANNING SCHEME – WATER QUALITY AND DRAINAGE CODE


                PERFORMANCE OUTCOMES                                ACCEPTABLE OUTCOMES                                  COMMENTS


 Stormwater drainage design Table 9.4.8.3 Criteria for assessment (part)
 Stormwater drainage design                               AO1                                            A stormwater management plan with a
 PO1                                                      A stormwater management plan is                proposed detention system and a treatment
                                                                                                         train has been prepared for the
 The development and its stormwater                       prepared consistent with PSP6                  development.
 management system is planned and designed                Engineering Design Standards - Roads,
 having regard to:                                        drainage and earthworks.
                 a.   the natural features of the site;
                 b.   the need to avoid impacts and
                      potential risks to ecologically
                      important areas;
                 c.   the likely effectiveness of
                      erosion and sediment control
                      and stormwater drainage
                      measures during rainfall events
                      during and post construction;
                      and
                 d.   the need to protect
                      environmental values and water
                      quality of receiving waters both
                      during and post construction.


 Stormwater Drainage Systems
 PO2                                                      AO2.1                                          A stormwater management plan with a
 Stormwater drainage infrastructure is planned,           Stormwater drainage planning, design and       proposed detention system and a treatment
 designed and constructed to:                             construction is in accordance with PSP6        train has been prepared for the
                                                                                                         development.
                                                          Engineering Design Standards - Roads,
           a.    incorporate allowance for increased      drainage and earthworks and the latest         Detailed design and construction of any new
                 flood risk and tidal inundation          version of the Queensland Urban Drainage       stormwater infrastructure will be undertaken
                 through pipework as a result of          Design Manual.                                 as per relevant Council standards.
                 cilmate change and sea level rise;                                                      .
           b.    ensure the development is                AO2.2
                 adequately drained; and                  The stormwater drainage system connects to a



BUNNINGS NOOSAVILLE                                                                                                                                     Page 1
Log in to download the original file

Appendix F - SBSMP.pdf · 11.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.