NOOSA PLANNING SCHEME – WATER QUALITY AND DRAINAGE CODE
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
c. ensure stormwater is managed and lawful point of discharge in accordance
lawfully discharged without altering with PSP6 Engineering Design Standards
stormwater drainage characteristics - Roads, drainage and earthworks.
external to the site.
AO2.3
Stormwater flows discharging from the
development are demonstrated to be
consistent with pre-development
characteristics.
AO2.4
Development provides for the management of
stormwater to incorporate appropriate
allowance for climate change impacts
(including rainfall intensity and sea level rise),
in accordance with PSP6 Engineering Design
Standards – Roads, Drainage and Earthworks.
PO3 AO3.1 A stormwater management plan with a
Stormwater drainage infrastructure conveys run-off Stormwater drainage infrastructure meets the proposed detention system and a treatment
in a manner that allows roads to deliver desired desired standards of service for roads train has been prepared for the
standards of service appropriate to the local functionality set out in PSP6 Engineering development.
conditions and local stormwater drainage Design Standards - Roads, Drainage and
characteristics. Earthworks.
Detailed design and construction of any new
stormwater infrastructure will be undertaken
as per relevant Council standards.
PO4 AO4.1 A stormwater management plan with a
Stormwater infrastructure is compatible with The location, design and construction of proposed detention system and a treatment
existing infrastructure, allows for easy access for stormwater drainage structures is in train has been prepared for the
the ongoing maintenance by Council, is cost accordance with PSP6 Engineering Design development.
effective across its design life. Standards - Roads, drainage and Detailed design and construction of any new
earthworks. stormwater infrastructure will be undertaken
as per relevant Council standards.
BUNNINGS NOOSAVILLE Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.