Original source · versioned page text
Attach F - Traffic
Attached to the e-mail MCU16/0012 - 5 Garnet Street Cooroy.
Original PDF page 20, section 1. The text section number identifies this passage in the reader.
[OCR of page images] PEKOL TRAFFIC & TRANSPORT Figure 4.2: PROPOSED PEAK HOUR TRAFFIC DISTRIBUTION 25% 75% SL t 75% 13% 3% 50% Garnet Street 10% 8% Maple Street. —— Maple Street 5% 3% Cooroy Station Access Road (east) 7 = Myallst 60% ~N | 25% 15% 35% Pou Elm Street tL Myall St 35% 44 Intersection Performance The likely impact of the proposed development on the future year (2017 and 2027) peak hour operations on the surrounding road network has been assessed using SIDRA. These analyses are based on the peak hour scenario turning movement forecasts for the existing operations and assumed turning proportions for the post-development scenarios, which are presented in Appendix E. 4.4.1 Myall Street / Garnet Street / Maple Street Roundabout SIDRA analyses were performed to quantify the future year (ie 2017 and 2027) peak hour operations of this intersection. These were undertaken using the layout shown in Figure 2.2. The results are summarised in Table 4.4 and presented in Appendix C. P:\2014-15\15-228 GARNET STREET, COOROY\REPORTS\15-228 GARNET ST, COOROY TIA.DOCX 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.