               EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
               Author                  Senior Development Planner, Tara Norley
                                       Development Assessment


                    APPLICATION DETAILS

                    Application No.                    REC14/0005.04

                    Development Approval               Development Permit to Reconfigure a Lot (1 Lot into 2 Lots)

                    Applicant                          Bunnings Properties Pty Ltd

                    Request Received On                18 June 2024

                    Report Completed Date              Nadine Gorton reviewed 28.10.2024


                    PROPERTY DETAILS

                    Property Address                   178 Eumundi Noosa Rd, Noosaville

                    RP Description                     Lot 101 SP 279285

                    Land Area                          26,635m2

                    Existing Use of Land               Bunnings Warehouse


                    STATUTORY DETAILS

                    SEQRP Designation                  Urban Footprint

                    Zone                               Medium Impact Industry

                    Precinct                           Not applicable

                    Local Area Plan                    Noosaville

                    Overlays                           Acid Sulfate Soils

                    Assessment Type                    Extension to Currency Period



               1.      PROPOSAL
               The applicant seeks an extension to the currency period for a Development Permit to Reconfigure
               a Lot (1 Lot into 2 Lots). The applicant is seeking an additional five (5) years to the currency,
               seeking a new currency period end date of 25 September 2029. The current currency period is
               due to expire on 25 September 2024.
               The applicant states:
                       During the currency of this reconfiguring a lot (ROL) approval, Bunnings have obtained
                       approval for a Material Change of Use (MCU) for a Hardware and trade supplies
                       (MCU22/0051), to be located on approved lot 103 identified within Figure 1 below. This MCU

                                                                                                       Page 1 of 3

Document Set ID: 23093969
Version: 5, Version Date: 04/11/2024
Full text of the other 2 pages

Page 2

               EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
                      approval was initially issued on 2 November 2023 and was subject to representations which
                      were not resolved until 21 May 2024.
                      Enacting the ROL has been on hold pending the outcome of this MCU application. Now that
                      the MCU approval is in place, this extension is sought in order to provide time for the ROL to
                      be enacted.
                      This extension to the currency period is sought to allow time to obtain necessary operational
                      works approvals and undertake the works necessary to enact the ROL. The 5-year extension
                      is also sought to align the ROL approval with the MCU approval recently obtained over the
                      site, which remains current until 26 October 2029, one month after the requested currency
                      date for this ROL approval.
               2.     BACKGROUND
               •    A development approval to Reconfigure 1 lot into 2 lots was issued on 4 July 2014.
               •    An extension to the current period was granted on 27 September 2018 which extended the
                    currency period to 25 September 2020.
               •    A minor change to the approval and an extension to the current period was granted on 3
                    November 2020 which extended the currency period to 25 March 2023. This currency period
                    included the first ministerial currency period extension (‘Covid extension’) of six (6) months
                    within the extension.
               •    The second ministerial currency period extension (‘Covid extension’) of six (6) months took the
                    currency period out to 25 September 2023.
               •    The third ministerial currency period extension (‘Covid extension’) of 12 months took the
                    currency period out to 25 September 2024.
               •    A Development Permit for a Material Change of Use – Hardware and trade supplies
                    (MCU22/0051) was approved by Council on 26 October 2023 for development over the
                    currently vacant portion of the lot (proposed Lot 103). A subsequent Negotiated Decision Notice
                    was issued on 21 May 2024.
               •    Upon receipt of this extension to the current period application (REC14/0005.04), Council
                    provided advice to the applicant to update conditions of the existing approval to align with the
                    recent MCU22/0051 approval. A minor change to the approval application (REC14/0005.05)
                    was lodged on 10 September 2024 seeking amendments to conditions to align with the
                    requirements of the MCU approval. The application is being assessed concurrently with the
                    subject application (REC14/0005.04).
               3.     ASSESSMENT
               The applicant has requested an extension to the currency period to the development approval
               under section 86 of the Planning Act 2016.
               The previous extension to currency period was approved 3 November 2020 following the
               commencement of the current Noosa Plan 2020, with the assessment report stating:
                      Since the last extension to currency in 2018 Council has adopted a new Planning Scheme,
                      the Noosa Plan 2020. Although the Council’s planning scheme has changed, there has been
                      no changes to the new Planning Scheme that would affect the assessment of the approval if
                      it were remade today and therefore proposal remains consistent with the new Planning
                      Scheme.
                      The application was referred to Councils water quality Officer as water quality treatment
                      requirements have changed since the original approval. The existing conditions are sufficient
                      with the development able to meet the current water quality requirements.
               It is also noted that the proposed lot sizes comply with minimum lot size requirements of 1000m2
               under both the 2006 and 2020 planning schemes.


                                                                                                       Page 2 of 3

Document Set ID: 23093969
Version: 5, Version Date: 04/11/2024

Page 3

               EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
               As outlined above, a Development Permit for a Material Change of Use – Hardware and trade
               supplies was issued on 21 May 2024 for development over the vacant portion of the lot (ie proposed
               Lot 103). The applicant is seeking to extend the currency period out to 2029 to align with the
               currency period for the MCU component.
               No major concerns are raised as a result of the extension request, noting that the MCU approval
               requires an additional Operational Works application to be lodged and assessed as part of the
               development process, which will ensure all works required on the site are carried out in accordance
               with current standards required at the time of the OPW application. Additionally, a subsequent
               minor change application has been lodged by the applicant seeking to amend conditions relating
               to frontage works and stormwater management to align with conditions imposed by MCU22/0051.




                                               Figure 1: Approved MCU and RAL plans

               4.     CONCLUSION
               The proposal is consistent with the provisions of the Noosa Plan 2020 and raises no concern.
               RECOMMENDATION
               With regard to Application No. REC14/0005.04 to extend the currency period of an existing
               approval for a Development Permit to Reconfigure a Lot (1 Lot into 2 Lots) situated at 178 Eumundi
               Noosa Rd, Noosaville Qld 4566 and described as Lot 101 SP 279285, Council on 28 October
               2024 decided to
               A.     Approve the extension to the currency period
               B.     Amend Item 3 of the Decision Notice to read as follows:
                      The currency period ends for this development approval on 25 September 2029, unless an
                      application to extend the currency period is approved by Council.




                                                                                                     Page 3 of 3

Document Set ID: 23093969
Version: 5, Version Date: 04/11/2024

Used in these records

About this file

File size
537 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period Report REC14_0005.04 {As Published}.pdf · 537 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.