Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Extension to Currency Period Report REC14/0005.04 {As Published}

of 3

Text shows just the words. Original shows the document exactly as it was published.

               EXTENSION TO CURRENCY PERIOD – DELEGATED REPORT
               As outlined above, a Development Permit for a Material Change of Use – Hardware and trade
               supplies was issued on 21 May 2024 for development over the vacant portion of the lot (ie proposed
               Lot 103). The applicant is seeking to extend the currency period out to 2029 to align with the
               currency period for the MCU component.
               No major concerns are raised as a result of the extension request, noting that the MCU approval
               requires an additional Operational Works application to be lodged and assessed as part of the
               development process, which will ensure all works required on the site are carried out in accordance
               with current standards required at the time of the OPW application. Additionally, a subsequent
               minor change application has been lodged by the applicant seeking to amend conditions relating
               to frontage works and stormwater management to align with conditions imposed by MCU22/0051.




                                               Figure 1: Approved MCU and RAL plans

               4.     CONCLUSION
               The proposal is consistent with the provisions of the Noosa Plan 2020 and raises no concern.
               RECOMMENDATION
               With regard to Application No. REC14/0005.04 to extend the currency period of an existing
               approval for a Development Permit to Reconfigure a Lot (1 Lot into 2 Lots) situated at 178 Eumundi
               Noosa Rd, Noosaville Qld 4566 and described as Lot 101 SP 279285, Council on 28 October
               2024 decided to
               A.     Approve the extension to the currency period
               B.     Amend Item 3 of the Decision Notice to read as follows:
                      The currency period ends for this development approval on 25 September 2029, unless an
                      application to extend the currency period is approved by Council.




                                                                                                     Page 3 of 3

Document Set ID: 23093969
Version: 5, Version Date: 04/11/2024

Used in these records

About this file

File size
537 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Extension to Currency Period Report REC14_0005.04 {As Published}.pdf · 537 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.