Council archive · source document
Attachment 3 - Engineering Report · MCU23/0030
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
9.0 ELECTRICITY AND TELECOMMUNICATIONS
Refer to detailed Site Survey by DSQ Land Surveyors, attached as Appendix B.
Underground electrical and telecommunications infrastructure exist within the verge of
Noosa Parade. It is anticipated that the existing infrastructure will be suitable to service
the proposed development. A qualified Electrical consultant will be commissioned to
prepare the Electrical and Telecommunications design during the Building Application
phase.
10.0 EARTHWORKS
Refer to the attached Engineering Drawings C6398/23/E01-02 for details of proposed
earthworks.
Earthworks cut, fill and retaining will be required in order to construct the basement
carpark and access driveway. Minor shaping and grading of existing levels around the
dwelling and at street frontages will be undertaken as part of proposed earthworks.
Proposed retaining walls will be integrated with building slabs/footings and it is therefore
proposed that details of these will be provided by a suitably qualified Structural Engineer.
11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.