Council archive · source document
Attachment 3 - Engineering Report · MCU23/0030
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
11.0 CONCLUSION The proposed design and construction of a residential development at 50 Noosa Parade, Noosa Heads may be readily serviced by existing infrastructure available within or near the subject site. Stormwater quantity management is not required for the site as stormwater discharge is directed to an existing stormwater drainage network, sized to convey developed site stormwater. The development site is exempt from pollutant load reduction targets. A rainwater harvesting tank will be provided in accordance with Noosa Shire Councils stormwater management code. It is also proposed to direct hardstand areas to landscaped areas for water quality buffering and gross pollutant removal prior to discharge at Noosa Parade road reserve. There are no constraints or impediments to the proposed residence that cannot be overcome by sound engineering design and best practice construction methods. 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3 - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 13.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.