SUPERSEDED Minor Change Existing Approval MCU21/0117 01 & OPPW21/0199.01 · MCU21/0117.01
25. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
26. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008.
Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
businesses that transport asbestos waste, and landfills that accept this waste.
27. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging are removed from the building prior to demolition/relocation.
Plumbing and Drainage
28. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
demolition of a building, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
notifiable Work and must be carried out by a suitably licenced plumber who must submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
LANDSCAPING
29. The development site must be landscaped. The works must be undertaken in accordance
with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
Landscaping Plans and in particular:
a. A dense 2m minimum landscaped setback to the full length of the site’s frontage to
Pearl Street (excluding access, fence and bin enclosure).
b. A dense 2.0 m minimum landscaped setback to the full length of the site’s frontage to
Elm Street.
c. A dense 1.0 m minimum landscaped setback to all side boundaries (excluding
stormwater infrastructure).
d. The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
e. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reach.
ENGINEERING
External Works
30. Pearl Street must be upgraded for the length of its frontage to the subject site. The works
must include in particular:
a. Construction of kerb and channelling and underground stormwater drainage to the
development side only;
b. Widening and sealing of the existing road pavement between the edge of the existing
road to the new lip of kerb for the width of the frontage;
c. Construction of a 2.0m wide pedestrian footpath in accordance with the conditions of
this Decision Notice;
d. Filling in of the table drain for the length of the frontage and providing an underground
stormwater line to accommodate flows from the upstream table drain;
Page 6 of 31
Document Set ID: 23112081
Version: 5, Version Date: 17/07/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Minor Change Existing Approval MCU21/0117 01 & OPPW21/0199.01Related documentApplication case desk ↗
About this file
- File size
- 936 KB (small file)
- File type
No other editions are linked here.