Skip to the record
Search everything, all in one place.

Council archive · source document

SUPERSEDED Minor Change Existing Approval MCU21/0117 01 & OPPW21/0199.01 · MCU21/0117.01

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      e.      Removal of the existing property access to 5 Pearl St and reinstatement of the kerb,
                              footpath and verge area to match the balance of the site frontage and proposed works,
                              including the provision of topsoil and turf where the existing verge is grassed.
                      Site Access and Driveways
               31.    A sealed access driveway must be provided from Pearl Street to all parking and manoeuvring
                      areas of the development. The works must include in particular:
                      a.      A driveway crossover generally in accordance with Councils standard drawing RS-051
                              and approved plan 23098 / SK10 Rev G as prepared by Morgan Consulting Engineers.
                      Car Parking
               32.    A minimum of 20 car parking spaces must be provided and marked on the site. The works
                      must include in particular:
                      a.      14 covered parking spaces within the total;
                      b.      Four visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use; and
                      c.      Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
                      Pedestrian and Bicycle Facilities
               33.    Pedestrian and bicycle facilities must be provided for the development. The works must
                      include in particular:
                      a.      A 2.0 metre wide footpath within the road verge for the entire length of the site’s
                              frontage on Pearl Street.
                      Stormwater Drainage
               34.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
                      works must be undertaken in accordance with an Operational Works approval and include in
                      particular:
                      a.      The works generally as shown on concept plan 23098/SK10 Revision G as prepared
                              by Morgan Consulting Engineers,
                      b.      Collection and lawful discharge of stormwater to ensure that adjoining properties,
                              reserves and roads are protected from ponding or actionable nuisance from stormwater
                              as a result of any works undertaken.
                      c.      the site stormwater system is to accommodate stormwater from Lot 1 RP153798
                              external to the site, including registration of drainage easements over the site drainage
                              system in favour of Lot 1 RP153798
                      d.      the use of gravity stormwater drainage and not surcharge pits
               35.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
                      by Design, 2012), and must include in particular stormwater quality treatment devices of a
                      size and location generally in accordance with those shown in cross sections shown on
                      concept plan 23098/SK10 Revision G as prepared by Morgan Consulting Engineers.
               36.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
                      Operational Works drawings for the stormwater quality treatment system and detailed life
                      cycle costing of the system must be attached as an addendum to this document. Records of
                      all maintenance activities undertaken must be kept and made available to Council upon
                      request.




                                                                                                         Page 7 of 31
Document Set ID: 23112081
Version: 5, Version Date: 17/07/2024

Used in these records

About this file

File size
936 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Minor Change Existing Approval MCU21_0117 01 & OPPW21_0199.01.pdf · 936 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.