SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 10 AUGUST 2021
Figure 3. Occupants
Figure 3 demonstrates the increased consumer utilisation of Boreen Point and Noosa North Shore,
with financial year 2020/21 occupant numbers exceeding occupant numbers achieved in previous
years.
4. Maintenance
Maintenance for each facility is performed in line with established budget allocations, including any
reactive maintenance. Completed works at the holiday parks include:
Park Maintenance Activities
Noosa River Holiday Park Minor tree trimming and tree removal.
Planting and garden regeneration.
Re-mulching of the foreshore camping area.
Installation of metered powerheads.
Asset renewal works – retaining walls.
Noosa North Shore Beach Tree trimming and tree removal works as part of cyclical
Campground framework for vegetation management and guest amenity.
Installation of a solar PV system on the Manager’s Residence.
Internal road maintenance.
Boreen Point Campground Refurbishment of the existing large amenity block and
replacement of ageing tank infrastructure (funded by the Unite
and Recover grant program).
Tree trimming and tree removal works as part of a cyclical
vegetation management program.
Creation of fuel reduction zones as part of a fire management
approach.
Regular road maintenance of the alternate access from Louis
Bazzo Drive.
5. Noosa North Shore Beach Campground Waste Water Treatment System
The wastewater treatment system (WWTS) was installed as part of the 2020 campground
refurbishment project. A number of issues have been identified with the operation of the WWTS
which pose commercial, environmental, operational and compliance risk to Council. Council has
implemented a precautionary cyclical waste water pump out schedule while Council works to
resolve the broader system issues. The system is being monitored by Council’s Plumbing Branch
and contractual advice has been sought on future actions.
Page 15 of 69
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.