ORDINARY MEETING MINUTES 20 APRIL 2017
7 ORDINARY MEETING REPORTS
1. FURTHER REPORT – OPW16/0189 - DEVELOPMENT APPLICATION FOR
OPERATIONAL WORKS PRESCRIBED TIDAL WORKS - EXTENSION TO AN
EXISTING DECK 290 GYMPIE TERRACE NOOSAVILLE
Council Resolution
Moved: Cr Stockwell
Seconded: Cr Glasgow
That Council notes the reports by the Coordinator Planning to the Planning &
Environment Committee Meeting dated 11 April 2017 and the General Committee
Meeting dated 18 April 2017 regarding Application No. OPW16/0189 for a
Development Permit for Operational Works for Prescribed Tidal Works – Extension to
an Existing Deck situated at 290 Gympie Terrace Noosaville and:
A. Approve the application for the following reasons:
1. The existing works constructed are consistent with the Overall Outcomes
of the Watercourses Works Code; and
2. The existing works constructed are consistent with the relevant Specific
Outcomes in the Watercourses Works Code with respect to:
a. Siting;
b. Character and Amenity; and
c. Design Construction and Safety
3. The existing works constructed are consistent with the IDAS Code for
Prescribed Tidal Works.
B. Approve the application subject to the following conditions:
Approved Plans
1. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
26159-S1 A Jetty Plan and Details June
2016
2. All structures associated with the development must be constructed wholly
within the approved area
3. Structures must be designed and constructed such that they are free
standing within the waterway and are not connected to or behind the
revetment wall or rock wall. Upon completion of works, a certification by
RPEQ must be provided to Council in this regard.
4. All structures must have no detrimental effects on stormwater drains and/or
easements.
5. The jetty and deck areas must be constructed in a manner to render the
underside area vermin proof
6. There must be no electrical reticulation system carrying electricity in excess
of 24 volts beyond the revetment wall unless all switches and power outlets
are positioned above the 1%AEP flood level.
7. Lighting associated with the use must be designed, installed, operated, and
maintained in accordance with Section 3 of AS4282 Control of the
Obtrusive Effects of Outdoor Lighting.
Page 12 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.