ORDINARY MEETING MINUTES 20 APRIL 2017
8. Wastewater and sullage must only be disposed of at approved pumpout
facilities.
9. The mooring facility must not be utilised for live-aboard purposes.
10. Any construction and post construction activity is not to impact on the
condition of the waterway, and is to be conducted so as not to breach the
Environmental Protection Act EPA (1994) and the Environmental
Protection (Water) Policy 2009.
11. Certification by a Registered Professional Engineer of Queensland that
states that the works have been constructed in accordance with best
practice methods and are structurally sound must be submitted to Council.
This certification must be submitted to Council within three (3) months of
the date of this approval. A final inspection and approval of the structure
by Council’s Inspector is also required. Please contact Council’s Planning
Assessment Section (Development Audit & Response Officer
0428738563) to arrange the inspection.
12. After completion, the proposed works must be maintained in a sound state
of repair in accordance with the approved plans
13. All necessary State government approvals relating to this development
must be obtained.
C. Include the following Advisory Notes:
ADVISORY NOTES:
General Advisory Notes
1. That the Prescribed Tidal Works are to be used for the purpose of providing
access to vessels and the ancillary lawful marine purposes conducted within the
subject lease;
2. That the approval makes it clear that operational works approval in no way
sanctions the use of the decks for a Type 1 Food and Beverage Business (i.e.
café with dining facilities for 10 or more people) or other uses requiring prior
approval under the planning scheme
3. Council has undertaken an audit check of the Operational Works drawings in
relations to the proposed works. A detailed check of the calculations and
drawings has not been undertaken, as they have been certified by a RPEQ. The
RPEQ bears full responsibility for all aspects of the engineering design. Council
reserves the right to require further amendments and/or additions at a later date
should design errors become apparent.
4. The approval or conditions do not absolve the owner of the land from complying
with all the conditions of this approval and/or relevant Council By-Laws and
Policies and/or relevant statues and/or statutory regulations in the execution
and/or performance of said works.
5. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for
extended periods of time.
6. Should any changes or modifications to the approved plans be required as a
result of construction constraints, a “Request to change an existing approval”
under the Sustainable Planning Act 2009 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the
appropriate fees.
Carried.
Page 13 of 14