Car Parking
27.   Carparking shall be provided within the site generally as shown on drawing number 07025SK1(c) dated
      27 August 2007 by Agenti Architects, except as modified herein.

28.   A minimum of 4 covered carpark spaces shall be provided on site.

29.   The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
      class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum
      head clearance (headroom) at any point of 2.2m.

30.   All carparking shall be kept, maintained and line-marked in a condition fit for use.
Frontage Works
31.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Attunga
      Heights frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants &
      Guidelines. Grass shall be couch, free of weeds.

32.   A new 1.5m wide concrete path shall be constructed along the Attunga Heights frontage of the site in
      accordance with Council’s design standards and to an alignment that protects any significant vegetation
      or any underground services.

33.   All paths, driveways and parking areas shall be designed and constructed to ensure pedestrian safety
      using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the
      Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility.

34.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
      paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
      prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
35.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank is used for external
      uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
      outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling. All rainwater tanks are to
      be designed and installed in accordance with the Queensland Development Code (QDC), Part 25 –
      Rainwater Tanks, and shall be part of the plumbing application in conjunction with the building approval.
      The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works /
      Operational Works approval and any overflow shall be directed to the stormwater drainage system.

36.   All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
      collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater
      drainage permitted to drain from the site shall be discharged to Council’s kerb & channel street drainage
      system in Attunga Heights. Plans of the drainage design shall be prepared by a Registered Professional
      Civil Engineer and submitted to Council prior to obtaining a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
      system at any one location is 25 litres/second.
37.   To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
      from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
      down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
      Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through a single
      underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
      shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme for the
      development and a copy of this shall be provided for Council’s records prior to commencement of the
      approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
38.   All site stormwater drainage shall be by means of a gravity system.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@700946e8\@[email protected]

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2007.00000616.001 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.