Catchment B
- Area – 0.1485 Ha
- Tc – 13 mins
- Fraction Impervious (Fi) – 0.41
Peak flow rates for the median design storm for the existing site are given in Table 6.3
Table 6.3 – Existing Site Peak Flow Rates (L/s)
Storm Event Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Cat A 79 119 160 186 218 259 287
Existing PFR
Cat B 27 39 52 59 69 83 91
Existing PFR
(PFR – Peak Flow Rate)
6.1.3 Proposed Site
The development consists of the construction of mixed residential townhouse/ unit development along
with a shared access driveway and ground level landscaping/ courtyards & a community pool area. The
total pervious area for the site was calculated to be approximately 1368m2.
The Developed site catchments are as follows.
Catchment A
- Area – 0.4363 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.77
Catchment B
- Area – 0.1955 Ha
- Tc – 6 mins
- Fraction Impervious (Fi) – 0.83
-
SCG Consulting Engineers Page 17 SCG Ref: 33132(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.