Peak flow rates determined for each 3 cases are outlined in Table 6.6.
Table 6.6 – Comparison of Peak Flows (L/s)
AEP Storm Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Existing 79 119 160 186 218 259 287
PFR A
Existing 27 39 52 59 69 83 91
PFR B
Mitigated 80 102 147 185 209 230 287
PFR A (+1) (-17) (-13) (-1) (-9) (-19) (0)
Mitigated 30 39 47 52 59 72 87
PFR B (+3) (0) (-5) (-7) (-10) (-11) (-4)
(PFR – Peak Flow Rate)
As shown in Table 6.6 the proposed OSD facilities have demonstrated the proposed mitigated peak
discharge flow rates will not exceed the total pre-development flows for all design storms above 2 year
ARI, up to and including the 1% AEP Design Storm. We note that there is a marginal increase in the
mitigated developed peak flow rate for the Q1 (1EY) storm event of 3L/s. However, as the increase in
stormwater discharge is considered very minor and below the design ARI for the minor stormwater
drainage system, the effect on the downstream network is considered to be insignificant and negligible.
Further, all stormwater discharging site in the developed case will discharge to the bio-retention basins
which both have an extended detention depth of 200mm prior to the allocated detention zone. This
equates to approximately 6kL of additional detention storage which has not been considered in the
calculation of peak stormwater discharge rates for the developed site. The peak stormwater discharge
values are therefore considered to be conservative and are expected to be less than the existing site. We
consider the developed site will not have a non-worsening effect on surrounding properties and
downstream network, with regard to stormwater discharge.
The proposed stormwater detention system is therefore considered to be adequate for the development.
SCG Consulting Engineers Page 21 SCG Ref: 33132(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.