6.2 Proposed Drainage
The proposed site drainage is detailed in drawings SCG 33132 - SW1.1 - SW1.4 (Appendix D) and is
discussed below.
As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -
1. Minor Drainage System - 10% AEP ARI (Q10 Storm)
2. Major Drainage System - 1% AEP ARI (Q100 Storm)
6.3 Downstream Infrastructure Consideration
The mitigated peak flow rates for both discharge points will be less than existing peak flow rates
discharging to the existing drainage infrastructure located in Lot 108 on SP106085, No.6 Starboard
Avenue, & the existing stormwater drainage infrastructure located within Headland Drive, as discussed
in Section 4.1. Therefore, it is considered acceptable as existing stormwater peak flows maintain existing
conditions.
7.0 FLOODING
Information provided from Noosa Council’s Flood Hazard Overlay Map confirms the site is unaffected
by flooding.
SCG Consulting Engineers Page 22 SCG Ref: 33132(SWMP).RevB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.