                                                                             Officer:            Georgina Schramm
                                                                             Direct Telephone:   07 5329 6569
                                                                             Our Reference:      131999.982846.3
                                                                             Your Reference:     n/a

               26 July 2023


               Mr PC Butt & JM Carr
               C/- Brennan Planning Pty Ltd
               44 Maple St
               COOROY QLD 4563
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 17 April 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              131999.982846.3

                   Street address:              18 Arakoon Cresent, Sunshine Beach

                   Real property description:   Lot 791 RP 48111

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 16 September 1999.
               •       Development Permit for Material Change of Use – Dwelling house in a Sand Dune Problem
                       Area.
               In relation to the request to make a minor change to the existing approval, Council on 21 July 2023,
               decided to approve the requested changes. The changes are detailed below.
               A. Approve the change.
               B. Include additional condition 18.
               3.      CURRENCY PERIOD OF APPROVAL

               Not Applicable.
               4.      ASSESSMENT MANAGER CONDITIONS

                         Building
               1.        Deleted.


               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                           Page 1 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023
Full text of the other 5 pages

Page 2

                         1.1      Deleted.
                         1.2      Deleted.
                         1.3      Deleted.
               2.        A contour survey of the subject site is to be carried out by a Licensed Surveyor and is to
                         be submitted to Council at the time of application for building approval. Such survey shall
                         set out the natural surface levels of the site and the position of buildings on the site.
               3.        A verification survey is to be undertaken on the building by a Licensed Surveyor and a
                         certificate lodged with Council at completion of the work confirming compliance with the
                         maximum building height above natural surface, required by the provisions of the Town
                         Planning Scheme.
               4.        The developer shall prepare at his expense, a geotechnical report and is to submit the
                         report for appraisal by Council's nominated geotechnical consultant and for approval by the
                         Manager of Building. The report is to be accompanied by a fee of $1200 to cover the
                         reasonable assessment costs of the consultant and the Manager of Building. A
                         Development Permit for building works must not issue until the report is approved and any
                         relevant findings incorporated into the design of the building works to the satisfaction of the
                         relevant assessment manager.
               5.       Notwithstanding the provisions of Section 11 of the Building Act and Clause 17 of the
                        Standard Building Regulation, this building shall be required to comply fully with the
                        provisions of the Building Code of Australia as though it were a new building.
               Engineering
               6.       As the site is located in a Sand Dune Problem area the design of all foundations (footings,
                        piles, or piers) shall be carried out by a qualified Professional Structural Engineer.
                        The foundation design shall be submitted to Council for approval by the Manager of Building
                        in conjunction with an application for a Development Permit for Building Works.
               7.       All excavations shall be adequately retained such that no batter extends over the boundary
                        alignment. Permeable retaining structures shall incorporate a membrane to allow water
                        migration but inhibit sand migration.
               8.       The removal of any existing vegetation is to be strictly limited to the proposed building
                        areas, and on completion of construction, dense, deep rooted vegetation cover using
                        approved species shall be established on any exposed soil in order to prevent any soil
                        movement or erosion.
               9.       A report by a Geotechnical Engineer on the suitability of the existing septic system shall be
                        submitted to Council for approval by the Manager of Building prior to the issue of a
                        Development Permit for Building Works, and if inadequate, upgrading of the existing system
                        will be required.
                        This site will ultimately be required to be connected to Council’s reticulated sewerage
                        system which is scheduled for construction within the foreseeable future. Any works carried
                        out under this permit should facilitate the future connection.
               10.      All on site stormwater including roof water is to be disposed of on site via a soakage pit and
                        in a manner that does not compromise the stability of the site. The soakage pit shall be
                        designed by a qualified Professional Hydraulic Engineer to cater for a Q100 storm, the
                        details of which are to be submitted to Council in conjunction with an application for a
                        Development Permit for Building Works.
               11.      Any alteration of any public utility or other facilities necessitated by the development of the
                        land or associated construction works external to the site shall be at no cost to Council.
               12.      Any person acting on this permit shall be responsible for the prevention of erosion and
                        sediment export from the site.




                                                                                                          Page 2 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023

Page 3

                        Site control measures such as silt fencing, controlled gravel access to the site and
                        controlled disposal of waste, may be necessary.
                        A $1,000 site control bond is required to be lodged prior to issue of a Development Permit
                        for Building Work (Detached Dwelling), to ensure compliance with this condition. It will be
                        refunded following compliance with this condition and satisfactory completion of all works,
                        less any costs incurred by Council in effecting compliance with the condition.
               Town Planning
               13.       Development undertaken in accordance with this approval must generally comply with the
                         approved plans of development. The approved plans are numbered 295/1-8 (Council/DP)
                         prepared by Gabriel & Elizabeth Poole Design Company and dated September 1999 and
                         as may be amended by these conditions.
                         Approved Plans - 19 May 2016 Additional Plans (retaining walls)

                          Plan No.            Plan Name                                                    Date

                          Q17-304-01          Footing Plan & Structural Notes                              n/a

                          Q17-304-02          Details – Section A-A and footing                            n/a

                          Q17-304-03          Details – Section B-B                                        n/a

               14.       Existing trees on the site and within road reserves are to be retained, except where required
                         to be removed due to building operations or the conduct of the approved use.
               15.       The requirements of this development approval are to be effected, prior to the use of the
                         premises. Council reserves the right to call upon the bond or guaranteed sum referred to
                         in this approval to effect compliance with conditions.
               16.       This Development Permit for a material change of use of premises lapses if:-
                         16.1     the use or erection of a building or other structure associated with the use, has not
                                  been commenced within four (4) years of the date of issue of the Development
                                  Permit, unless application is made and approved by Council for an extension; or
                         16.2     the use of any premises pursuant to the Development Permit ceases.
               17.       Prior to the commencement of development, the developer must obtain a Development
                         Permit for building works.
                         Approved Plans – 21 July 2023 Additional Plans (lift)
               18.      Development undertaken in accordance with this approval must generally comply with the
                        approved plans of development. The approved plans are numbered 295/1-8 (Council/DP)
                        prepared by Gabriel & Elizabeth Poole Design Company and dated September 1999 and
                        as may be amended by these conditions.

                          Plan No.      Plan Name                                                Date

                          11            Proposed Site Plan, prepared by JMF Design               20 February 2023

                          12            Proposed Level 2 Floor Plan, prepared by JMF 20 February 2023
                                        Design

                          13            Proposed Level 3 Floor Plan, prepared by JMF 20 February 2023
                                        Design

                          16            Proposed Section, prepared by JMF Design                 20 February 2023




                                                                                                          Page 3 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023

Page 4

                          15           Proposed Section, prepared by JMF Design               20 February 2023

               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               Development Contributions
               A letter outlining the estimate of contributions payable under the current Planning Scheme Policies
               will be forwarded by Council's Infrastructure Charges Officer under separate cover.
               Please contact Council's Infrastructure Charges Officer at least 3 days prior to payment for issue
               of a payment advice (which is to accompany the payment).
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required             Subject of the required Development Permit

                Development Permit for Building Works           All Building Works

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.

               Yours faithfully,




               Georgina Schramm
               Development Planner




                                                                                                       Page 4 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023

Page 5

               Enc:     Appeal Rights
                        Approved Plans/Documents
               cc.      Unitywater




               DECISION NOTICE HISTORY
               •     Original Decision Notice – 131999.982846 – 16 September 1999.
               •     Change to an Existing Approval – 131999.982846.1 – 19 May 2016, delete conditions 1, 1.1, 1.2 & 1.3 and with an amendment
                     to condition 13.
               •     Decision Notice – Minor – 131999.982846.2 – 18 May 2018, with an amendment to condition 13.

               •     Decision Notice - Minor - 131999.982846.3 21 July 2023, add additional condition 18.




                                                                                                                               Page 5 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023

Page 6

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 6 of 6
Document Set ID: 22519080
Version: 4, Version Date: 26/07/2023

Used in these records

About this file

File size
150 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Minor Change - 131999 982846 3 [As Published].pdf · 150 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.