Council archive · source document
Development Application part 1 · OPW13/0675
Very large file (28.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
I 7.2 Is any of the proposed tidal work to be carried out In a wild river area under the WildRivers Ac/2(}()$/
D No Go to question 7.6
DYes Continue to question 7.3
1 7.3 Is the proposed tidal work for any of the specified works under the Wild Rivers Ac/2f)()$/
Infrastructure and works prescribed under a regulation to be necessary for disaster D Yes D No
management
De-snagging that is the minimum necessary to allow safe navigation of a marked navigable D Yes D No
channel
Infrastructure that is roads, railways, pipelines conveyor belts and cables D Yes D No
Jetties and boat ramps for use by the public D Yes D No
Works for rehabilitation of land (e.g. rehabilitation of abandoned mines) D Yes D No
Infrastructure for the transmission or distribution of electricity D Yes D No
Other infrastructure, prescribed under a regulation that relates to the transportation, D Yes D No
movement, transmission or flow of anything through a wild river area including, for example,
goods, materials, substances, matter, particles with or without charge, light, energy,
information and anything generated or produced
If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. End of part 7 of this checklist
If yes to any of the above, continue to question 7.4
7.4 Will the proposed operational work be carried out on land to which a property development plan
applies?
D No Go to question 7.6
DYes Continue to question 7.5
17.5 Is the proposed development consistent with the property development plan?
D No . This aspect of development is prohibited development and no application can be made
. End of part 7 of this checklist
D Yes . Continue to question 7.6
17.6 Is any of the proposed tidal work prescribed tidal work?
D No . This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence against the Tidal works, or development in a coastal management district state code in
the SDAP.
. You must complete IDAS form 23-Tidal works and development within coastal management districts
. End of part 7 of this checklist
D Yes . You must complete IDAS form 23-Tidal works and development within coastal management districts
. This application requires assessment by the local government as assessment manager and the chief
executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the
application to DSDIP
. End of part 7 of this checklist
Checklist 4-Operational work
Version 3.0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1Related documentApplication case desk ↗
About this file
- File size
- 28.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.