Council archive · source document
Development Application part 1 · OPW13/0675
Very large file (28.6 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Section reference:
Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
Sustainable Planning Act 2009, schedule 1, items 2 and 4
I Part 8-Coastal management
I 8.1 Is the proposed operational work any of the following:
Excluded works D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Work carried out on premises to which structure plan arrangements apply D Yes D No
If no to all of the above, continue to question 8.2.
If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 8 of this checklist.
I 8.2 Is the proposed operational work for any of the following?
Interfering with quarry material as defined under the Coastal Protection and Management Act D Yes D No
1995 on state coastal land above high-water mark
Disposing of dredge spoil or other solid waste material in tidal water D Yes D No
Constructing an artificial waterway D Yes D No
Removing or interfering with coastal dunes on land, other than State coastal land, that is in an D Yes D No
erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
high-water mark
If you answered no to all of the above, a development permit is not required for this aspect of development and
that is the end of part 8 of this checklist
If you answered yes to any of the above, continue to question 8.3
I 8.3 Is any of the proposed work to be carried out In a wild river area under the Wild Rivers Act2tJ(J$1
D No . This application may require assessment by DSDIP’s SARA as assessment manager or concurrence
agency against the Tidal works, or development in a coastal management district state code in the
SDAP.
. You must complete IDAS form 23-Tidal works and development within coastal management districts
. End of part 8 of this checklist
D Yes . Continue to question 8.4
I 8.4 Is all of the proposed operational work for specified works under the WIldRIvers Act2D1J$1
D No . This aspect of the development is prohibited development and a development application cannot be
made
. End of part 8 of this checklist
D Yes . Continue to question 8.5
Checklist 4-Operational work
Version 3.0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 1Related documentApplication case desk ↗
About this file
- File size
- 28.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.