Original source · versioned page text
Geotech Report - Acid Sulfate Soil Assessment - Appendix A
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
BORE REPORT Client: Scanlan Properties Pty Ltd BORE 4 Project: Residential Development Page No: 1 of 1 Location: 215-219 David Low Way, Peregian Beach Date: 8 June 2007 Project No: 07160 Ground Surface Level: RL 6.0m* = & 2 2 E Description > ce a = = ax || B | 2 2 3 g E| 3 2 2 e s z|#| & 5 3B a a a wn ” e 6.0 0. H FILL ao - grey-brown and orange, sandy fine to medium sub-angular gravel D SAND (SP) 0.25 - light grey-brown, fine grained 5 0.5 7 D 4 0.75 D 14 5.04 1.0 D | 1.25 4 D 1.5 | D | 1.75 D 25 4.04 2.0 D ] 2.25 il D 25 J End of Bore at 2.5 m 4 35 3.05 D__ Disturbed Sample E Environmental Sample c NMLC Coring B_ Bulk Sample S$ Standard Penetrometer Test (SPT) Is(50) Point Load Test Result (MPa) U_—_Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (d) Diametral Point Load Strength Test pp Pocket Penetrometer Test (kPa) () No Sample Recovery (a) Axial Point Load Strength Test Rig: Hydrapower Trekker Drilling Method: Auger Groundwater: No free groundwater encountered during auger drilling Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.