Original source · versioned page text
Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan
Very large file (17.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Subject: 18164 [MCU16/0153 & REC16/0041] - 215 David Low Way Peregian Beach - Operational Works Application (EMAIL 2/3) From: Christopher Godwin Date: 2019-11-26T02:24:20+00:00 To: Mailbox Council Mail Noosa Shire Council Development Assessment, RE: 18164 [MCU16/0153 & REC16/0041] - 215 David Low Way Peregian Beach - Operational Works Application (EMAIL 2/3) Please find attached the following supporting documentation for the operational works application for the above mentioned development split over multiple emails due to file size: EMAIL 1/3 * IDAS Form 1 * Civil Design Certificate * Civil drawing package * Condition 16 – Access and Driveways * Condition 18 – Car Parking * Condition 19 – Service Vehicles * Condition 20 – Pedestrian Facilities * Condition 21 – Stormwater Drainage * Condition 31 – Earthworks and Retaining Walls EMAIL 2/3 * Site Based Stormwater Management Plan * Condition 22 – Stormwater Drainage * Acid Sulphate Soil and Groundwater Management Plan * Condition 27 – Acid Sulphate Soils EMAIL 3/3 * Fauna Management Plan * Condition 41 – Fauna Management * Landscaping drawing package * Condition 42 – Landscaping Works * Bushfire Management Plan * Condition 45 – Bushfire * Environmental Management Plan * Conditions 49 & 50 – Environmental Management Plan * Waste Management Plan * Condition 51 – Building Demolition/Removal/Relocation * Preliminary Construction Management Plan * Condition 75 – Preparation of a Preliminary Construction Management Plan The attached documentation covers all conditions requesting operational works applications, therefore please confirm if Council require any further documentation to ensure there are no outstanding assessments required following approval of the attached. Further to the above, please provide the fee quote for the operational works application review so this can be paid as soon as possible. Please contact me if you have any questions. Regards, Christopher Godwin Civil Team Leader BE(Civil)(Hons) MIEAust CPEng RPEQ NER MORGAN CONSULTING ENGINEERS T: 07 3369 8411 | F: 07 3369 1893 | [email protected]<mailto:[email protected]> 1 Great George Street Paddington QLD 4064 | www.morgance.com.au<https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.com%2Fv3%2F__http%3A%2F%2Fwww.morgance.com.au%2F__%3B!WAYtP8DCH83FtDI!G88SKs-rS0HG2VJd_xz3zsjy_aP8fOr9pM5th-mmyASdKvwgXYrTQDRpJxwAgAMN1OAN%24&data=02%7C01%7C[email protected]%7C3330fa795c0e4bdb612208d77235c6d5%7C99d9dd67b90f4999a44ef2d3700133b2%7C0%7C0%7C637103449610889135&sdata=Aqtmsdi59oRMVizeTffCPi%2BTCoHgi%2FpVtymcRLc5jNI%3D&reserved=0> Please note that our office will close on Friday 20 December 2019 and will re-open on Monday 6 January 2020. Best wishes from everyone at Morgan Consulting Engineers for a Merry Christmas and a safe and prosperous New Year.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.