Decision Notice OPW21-0063
13. Turfed areas must be must be free of pest, diseases and weeds and level with adjoining
surfaces.
Bonds
14. A site control and/or compliance bond of $3000 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
15. Bonds must:
a. Meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. Include GST;
c. Be lodged with Council and accompanied by the Bond Administration Fee/s; and
d. Be requested for release by writing to Council, when relevant approval requirements
have been met.
DURING CONSTRUCTION
Engineering
16. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works.
17. The developer must meet any costs to repair damage to any Council asset during
construction, where damage is a result of the development works. Damage to assets must
be repaired immediately where it creates a hazard to the community. In circumstances where
the damage does not create a hazard to the community, it must be repaired immediately on
completion of the works associated with the development.
18. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines; and
c. The latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
19. Excess material from verge reshaping must be disposed of lawfully.
20. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should footpath/road closures be necessary to carry out construction works,
Council’s Engineering Officer must be notified prior to the proposed closure and all
requirements complied with.
21. All works must match neatly with existing road and verge/footpath features. Additional works
beyond the frontage may be required to provide an acceptable transition to existing road and
verge/footpath profiles.
Driveways
22. The driveway crossover must be constructed generally in accordance with:
22.1. The approved plan 20651-C1100 Rev C (as prepared by Tod Consulting); and
22.2. Gympie Regional Councils standard drawing R-04.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.