                                                                                                    2411-43615 SRA




Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)


 No.     Conditions                                                                     Condition timing
 Development Permit: Material change of use
 10.9.4.2.4.1 – Material change of use near a state transport corridor—The chief executive
 administering the Planning Act 2016 nominates the Director-General of the Department of Transport
 and Main Roads (DTMR) to be the enforcement authority for the development to which this
 development approval relates for the administration and enforcement of any matter relating to the
 following conditions:
 Stormwater management
 1.      (a) Stormwater management of the development must not cause                    (a) At all times
             worsening to the operating performance of the state-controlled
             road, such that any works on the land must not:
             i.      create any new discharge points for stormwater runoff
                     onto the state-controlled road
             ii.     concentrate or increase the velocity of flows to the state-
                     controlled road
             iii.    interfere with and/or cause damage to the existing
                     stormwater drainage on the state-controlled road
             iv.     surcharge any existing culvert or drain on the state-
                     controlled road
             v.      reduce the quality of stormwater discharge onto the
                     state-controlled road
             vi.     impede or interfere with any overland flow or hydraulic
                     conveyance from the state-controlled road
             vii.    reduce the floodplain immunity of the state-controlled
                     road.
                                                                                        (b) Prior to obtaining
         (b) Submit RPEQ certification with supporting documentation to the             development approval
             North Coast Region, Development Assessment Team, via
                                                                                        for operational work or
             [email protected], within DTMR, confirming that
             the development has been designed in accordance with part (a)              building work,
             of this condition.                                                         whichever occurs first
                                                                                        for the relevant stage
         (c) Submit RPEQ certification with supporting documentation to the
             North Coast Region, Development Assessment Team, via                       (c) Within 20 business
             [email protected], within the DTMR, confirming
                                                                                        days of the completion
             that the development has been constructed in accordance with
             parts (a) and (b) of this condition.                                       of works

 Vehicular Access onto the state-controlled road
 2.      (a) Road access is located generally in accordance with Site Plan,             (a) At all times
             prepared by DCM Building Design, dated 31.10.2024, drawing
             number DD-1.01, issue C (Amended in red by SARA).
                                                                                        (b) and (c)
         (b) Provide road access works comprising a minimum 6 metres wide
             vehicle crossing - heavy duty driveway, at the road access                 Prior to the
             location referred to in part (a) of this condition, generally in           commencement of use
             accordance with Site Plan, prepared by DCM Building Design,                and to be maintained at
             dated 31.10.2024, drawing number DD-1.01, issue C (Amended                 all time.
             in red by SARA).

         (c) Design and construct the road access works, referred to in part


 State Assessment and Referral Agency                                                                  Page 4 of 10
Log in to download the original file

2411-43615 SRA_Response with conditions_MCU24-0144.pdf · 367 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.