2411-43615 SRA_Response with conditions_MCU24-0144
Attached to the e-mail SARA application correspondence - Response - MCU24/0144.
2411-43615 SRA
Corridor Management Team at and to be maintained at
[email protected] within DTMR, confirming that all times
compliance with part (a) of this condition has been achieved.
5. Install on the level 1 of the northeastern facing balcony of Unit 1 as Prior to the
shown on Level 1 Plan, prepared by DCM Building Design, dated commencement of use
31/10/24, reference DD-2.02, revision C (Amended in red by SARA): and to be maintained at
all times
(a) a continuous solid gap-free structure, constructed of glass,
concrete blocks, bricks or fibre cement sheeting, or
balustrade, other than gaps required for drainage purposes
in accordance with the Building Code of Australia
(b) highly acoustically absorbent material treatment for the total
area of the soffit above the balcony.
State Assessment and Referral Agency Page 6 of 10