Skip to the record
Every meeting, every word.

Original source · versioned page text

2017-09-12 Planning & Environment Committee Agenda

of 144

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (25.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           12 SEPTEMBER 2017


    27.   Certification for each stage must be submitted to Council from a qualified person*
          which certifies that the development has been constructed in accordance with the
          bushfire management conditions of this Decision Notice, prior to the commencement
          of use. *(Refer to Advisory Note)
    28.   External works, pathways, must be provided with the first stage of the development in
          accordance with an Operational Works approval, unless already constructed, and
          must include in particular:
          a.    A new 2.0 metre wide concrete pathway must be constructed along the full
                length of the eastern boundary lines for Lot 6 SP178340 (this property) and Lot
                3 SP 221524 (the adjoining site) generally within the created pathway reserve
                and to alignment protects existing trees.
          b.    A new concrete pathway must be constructed within the unformed road reserve
                south to the site. This pathway must connect to the pathway along the eastern
                boundary and connect to the existing cul-de-sac end of Resort Drive, and shall
                be 2.0m wide and reduced to a minimum width of 1.5 meter where necessary to
                protect existing vegetation.
          The pathways must be designed and constructed in accordance with relevant
          standards and best engineering practice using method/s of construction that minimise
          the impact on natural flora and fauna and maintenance needs while also ensuring
          pedestrian safety.
          This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
          being non-trunk infrastructure.
    30.   Two temporary cul-de-sac ends with a turning circle 9.0m in radius minimum must be
          constructed at both ends of the proposed driveway of compacted gravel and stable
          approved sealed surface to allow for vehicles, particularly refuse collection trucks, to
          turn around in forward gear. The works must include any required batters and/or
          retaining walls and be undertaken in accordance with an Operational Works approval
          as follow:
          a.    for the western cul de sac, prior to the commencement of use of Stage 6B,
          b.    for the eastern cul de sac, prior to the commencement of use of Stage 2B.
    31.   A minimum of 80 car parking spaces must be provided and marked on the overall site
          generally in accordance with the approved plans. The works may be staged and
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:
          a.    9 visitor parking spaces within the total, which are clearly marked for that
                purpose and accessible at all times for visitor use.
          b.    Crossfalls, gradients and vehicle headroom in accordance with Australian
                Standard AS2890: Parking Facilities.
          c.    The minimum number of parking spaces as indicated on the approved plans for
                each of the buildings in the particular Stage.
    37.   Each stage of the development must be provided with a stormwater drainage system
          connecting to a lawful point of discharge. The works must be undertaken in
          compliance with a development permit for operational works and must include in
          particular:
          a.    Stormwater collection and pipe system in accordance with the requirements of
                latest Queensland Urban Drainage Manual (QUDM) and related guidelines.




                                                                                 Page 25 of 168
Log in to download the original file

2017-09-12 Planning & Environment Committee Agenda(PDF, 25MB).pdf · 25.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.