PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 SEPTEMBER 2017
27. Certification for each stage must be submitted to Council from a qualified person*
which certifies that the development has been constructed in accordance with the
bushfire management conditions of this Decision Notice, prior to the commencement
of use. *(Refer to Advisory Note)
28. External works, pathways, must be provided with the first stage of the development in
accordance with an Operational Works approval, unless already constructed, and
must include in particular:
a. A new 2.0 metre wide concrete pathway must be constructed along the full
length of the eastern boundary lines for Lot 6 SP178340 (this property) and Lot
3 SP 221524 (the adjoining site) generally within the created pathway reserve
and to alignment protects existing trees.
b. A new concrete pathway must be constructed within the unformed road reserve
south to the site. This pathway must connect to the pathway along the eastern
boundary and connect to the existing cul-de-sac end of Resort Drive, and shall
be 2.0m wide and reduced to a minimum width of 1.5 meter where necessary to
protect existing vegetation.
The pathways must be designed and constructed in accordance with relevant
standards and best engineering practice using method/s of construction that minimise
the impact on natural flora and fauna and maintenance needs while also ensuring
pedestrian safety.
This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009
being non-trunk infrastructure.
30. Two temporary cul-de-sac ends with a turning circle 9.0m in radius minimum must be
constructed at both ends of the proposed driveway of compacted gravel and stable
approved sealed surface to allow for vehicles, particularly refuse collection trucks, to
turn around in forward gear. The works must include any required batters and/or
retaining walls and be undertaken in accordance with an Operational Works approval
as follow:
a. for the western cul de sac, prior to the commencement of use of Stage 6B,
b. for the eastern cul de sac, prior to the commencement of use of Stage 2B.
31. A minimum of 80 car parking spaces must be provided and marked on the overall site
generally in accordance with the approved plans. The works may be staged and
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. 9 visitor parking spaces within the total, which are clearly marked for that
purpose and accessible at all times for visitor use.
b. Crossfalls, gradients and vehicle headroom in accordance with Australian
Standard AS2890: Parking Facilities.
c. The minimum number of parking spaces as indicated on the approved plans for
each of the buildings in the particular Stage.
37. Each stage of the development must be provided with a stormwater drainage system
connecting to a lawful point of discharge. The works must be undertaken in
compliance with a development permit for operational works and must include in
particular:
a. Stormwater collection and pipe system in accordance with the requirements of
latest Queensland Urban Drainage Manual (QUDM) and related guidelines.
Page 25 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.