PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 SEPTEMBER 2017
b. Stormwater retention and/or detention systems must be provided within the
property to ensure all stormwater runoffs from each cumulative stage of the
development on the site are maintained to its predevelopment rates for all
storm events up and including 1% AEP.
48. The application for operational works approval must demonstrate, through water
balance calculations prepared by a hydraulic engineer, that the hydraulic residence
time of the Noosa Springs Lake System will not be reduced as a result of stormwater
management on each cumulative stage of the development the site.
50. For a minimum of 5 rainfall events per year, stormwater at the following locations and
times must be collected and sampled for Total Nitrogen, Total Phosphorous and Total
Suspended Solids using NATA accredited methods:
a. The release point from Precinct E2 for all waters directed to the Noosa Springs
lake system.
b. At monitoring point W6 shown on Plan A – Water Quality Monitoring Locations
Noosa Springs by Jelliffe Environmental (Qld) Pty Ltd.
The time for collection of water samples for monitoring must be quantified by the
applicant’s hydraulic engineer within the Operational Works application for
stormwater. The time for water quality monitoring shall be a minimum of the time of
concentration for all waters from Precinct E2 destined for the Noosa Springs Lake
System to reach the release point from Precinct E2, and within a maximum of 24
hours of commencement of rainfall events that generate runoff from Precinct E2.
Water quality monitoring required by this condition must commence at the
commencement of operation of the first stage of the development until five (5) years
following the completion of the final stage of the development
51. The annual and long term 90th percentile concentrations of Total Nitrogen, Total
Phosphorus and Total Suspended Solids measured within runoff from Precinct E2
must not be higher than the 90th percentile concentrations of those parameters
measured within the receiving Noosa Springs Lake System. The applicant must
notify Noosa Council within 24 hours of becoming aware of non-compliance with this
condition.
52. The first application for Operational Works Approval for this development must
include:
a. An overall concept stormwater design for the completed development that is
able to satisfactorily meet all conditions of this approval.
b. A monitoring strategy prepared by a suitably qualified person to demonstrate
how the water monitoring obligations of this development approval will be met.
c. A stormwater infrastructure design that incorporates a facility suitable for
obtaining the water samples needed to fulfil the obligations of this development
approval;
53. The Operational Works application for stormwater for each stage development must
demonstrate that all stormwater runoff from hardstand and fertilised landscaped
areas of the relevant and cumulative stage, including runoff destined for groundwater
infiltration will be treated to achieve pollution reduction targets to achieve an 80%
reduction in Total Suspended Solids, 60% reduction in Total Phosphorus and 45%
reduction in Total Nitrogen compared to an untreated scenario.
Page 26 of 168
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.