Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

8. APP G. Engineering RFI Response

Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

         PROPOSED DEVELOPMENT
         This development application seeks approval for the following uses:

          -    Retail Business Type 5 – Vehicle Uses (service station);

          -    Retail Business Type 2 – Shop & Salon (shop within service station);

          -    Industrial Business Type 2 – Production, Alteration, Repackaging & Repairing;

          -    Industrial Business Type 1 – Warehouse;

          -    Retail Business Type 6 – Hardware Store; and

          -    Entertainment and Dining Business Type 1 – Food & Beverages (restaurant/café).

         Landscaping and 59 car parks will also be provided as part of this development. Dual access is
         proposed to the overall site through a left in, left out access from Eumundi Noosa Road, and
         access from Lionel Donovan Drive.

         Refer to Appendix A for proposed plans.


         PROPOSED INTERNAL DRAINAGE PATTERN
         As much as practicably possible the proposed development will maintain and/or improve the
         functionality of the existing drainage pattern. Cut and fill earthworks are proposed across the
         site to generally bring the levels of Lot 31 into line with Lot 4. However, these works are not of a
         significant volume nor do they alter the stormwater runoff regime.


         EXTERNAL CATCHMENTS
         The site is not subject to any external catchments.


         FLOOD ASSESSMENT
         Noosa Council provides River and Storm Tide Flood Maps to assess whether the site will be
         affected by flooding. The proposed development site is not within the flood line for either River
         or Storm flooding. The flood maps can be found in Appendix C.




                                                                                           Stormwater Management Plans
Page 4                                                                       Hyder Consulting Pty Ltd-ABN 76 104 485 289
                                         f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
Log in to download the original file

8. APP G. Engineering RFI Response.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.