INTERNAL CATCHMENT ASSESSMENT
TEMPORAL PATTERNS
Rainfall data and information from the Australian Bureau of Meteorology was utilised to
generate the design storm event hydrographs for the stormwater run-off. Intensity-Frequency-
Distribution (IFD) charts and tables for the specific subject site are presented in Appendix D.
LEGAL POINT OF DISCHARGE
The subject site currently contains three internal catchments which discharge flows into three
separate locations.
- At the southern border of the site, there is a 600mmx600mm field inlet pit, which collects
flows and discharges to a 300mm diameter stormwater pipe within the Lionel Donovan
Drive road reserve.
- There are two field inlets located within the kerb and channel along Eumundi Noosa
Road, which collect flows from Lot 4SP159610. These pits discharge into a 675mm
diameter pipe within the Eumundi Noosa Road road reserve. These pipes flow to the
north toward Lake Doonella and the Noosa River.
- There is also a 225mm diameter pipe within the existing drainage easement of Lot
31SP170751. This then increases to a 300mm diameter stormwater pipe in the adjacent
lot to the east. At the junction of these pipes is a 600mmx900mm field inlet, which collects
overland flow from Lot 31SP10751.
The internal catchments are illustrated in the engineering drawings in Appendix B.
CATCHMENTS
The site has three internal catchments. Details of these catchments are provided in Hyder
Drawings SK01300-AA007595-01.
CATCHMENT 1 DISCHARGE
Catchment 1 is a small internal catchment at the south of Lot 4 on SP159610. In its existing
state, the catchment area is used for commercial and automative purposes.
Table 4.1, below, lists the catchment characteristics for the site.
Table 4.1 – Peak discharge flow rates comparison
PARAMETERS EXISTING DEVELOPED
Approx. Developed Area 0.10 0.09
Fraction Impervious 0.85 0.85
Coefficient of Runoff (C10) 0.87 0.87
Coefficient of Runoff (C50) 1 1
Time of Concentration 5 minutes 5 minutes
139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289 5
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.