8. APP G. Engineering RFI Response
Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
Detailed catchment plans and assessments are also provided in Appendix B.
RATIONAL METHOD CALCULATIONS
In the existing case analysis the time of concentration for the above catchment 3 areas have
been derived with the use of the Friends Sheet Flow Equation in accordance with the
Queensland Urban Drainage Manual (QUDM Equation 4.5) and Argue’s Flow travel time in
pipes and channels (QUDM Section 4.6.7). These equations require parameters including the
total length of the flow path, slope and surface roughness/channel type.
In the developed case analysis a combined application of standard inlet time for industrial areas
has been employed to determine the time of concentration (QUDM Sections 4.6.5 and 4.6.7).
The Coefficient of Runoff was determined using QUDM Tables 4.05.3a & 4.05.3b.
The rational method, as prescribed by QUDM Section 4.03 was then used to determine
discharging flow rates for standard average return intervals (ARI’s) of 1, 2, 5, 10, 20, 50 and 100
years. Detailed Rational Method calculation results are attached in Appendix E.
XP-RAFTS
XP-RAFTS is a computer based program which generates detailed event hydrographs for
specified storm events. XP-RAFTS was used to determine the critical storm duration for a range
of standard recurrence interval storm events for all catchments. Detailed catchment parameters
are used by XP-RAFTS including manning’s values, vectored slope of the site and percentage
impervious.
The results of the Rational Method calculations were employed as a basis for calibration and
verification of the development of hydrologic models for each of the included catchment areas.
Presented below is a summary of the peak discharge flow rates for all ARI’s calculated using
XP-RAFTS.
Table 4.3.4: Peak Discharge Flow Rates – XP-RAFTS
Storm Event Existing Developed Difference (%)
1 in 1 0.039 0.161
+313%
1 in 2 0.054 0.206 +281%
1 in 5 0.076 0.239 +214%
1 in 10 0.094 0.269 +186%
1 in 20 0.117 0.311 +166%
1 in 50 0.135 0.342 +153%
1 in 100 0.155 0.408
+163%
139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289 7
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.