8. APP G. Engineering RFI Response
Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..
Original PDF page 26, section 1. The text section number identifies this passage in the reader.
Figure 6.3: MUSIC Model Layout for Convenience Centre Development
The bio-retention areas for each catchment are listed below:
- Catchment 1: 32 m2 of filter media area
- Catchment 2: 22m2 of filter media area
- Catchment 3: 72m2 of filter media area
FUEL AREAS
The proposed development will need to comply with the Australian Standard 1940 – The
Storage and Handing of Flammable and Combustible Liquids. A blind sump, capable of
containing as a minimum the quantity of at least the largest compartment of the delivery tanker,
Stormwater Management Plans
Page 14 Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.