CONCLUSION
The Site Based Stormwater Management Plan has been prepared to provide a design proposal
and guide to the stormwater quantity and quality management techniques for the proposed
convenience centre site.
The three primary objectives of this SBSMP have been to ensure that:
1. Suitable measures are incorporated in the development to ensure that there are no
adverse impacts to downstream receiving waterways, property or infrastructure
resulting from any increase to peak discharging stormwater flow rates;
This has been achieved by demonstrating that the proposed development does not
increase runoff flows from Lot 4 on SP159610. Development on Lot 31 SP170751 involves
the construction of a detention basin which will detain peak flow discharges to the existing
level.
2. Investigate flood issues affecting the site and set appropriate finished levels for the
proposed development to ensure adequate flood immunity is achieved.
This has been achieved by reviewing Council’s flood records. It was established that the
site is not affected by flooding.
3. Details of a proposed stormwater quality treatment train are provided to ensure the
discharge of stormwater from the site is of adequate quality standards to comply
with the requirements of Noosa Council and the South-East Queensland Healthy
Waterways Partnership.
This has been achieved by the provision of a proposed stormwater treatment train which
has been specifically designed and verified to achieve the necessary objectives under the
Water by Design ‘MUSIC Modelling Guidelines’ approach. The treatment train includes a
bio-retention area prior to the three legal points of discharge on site.
An assessment of the development against Noosa Council’s Stormwater Code has been
provided in Appendix H.
Additionally, an Erosion Hazard Assessment has been carried out which has identified that
the site is ‘low’ risk under the Noosa Council assessment guidelines. It is proposed that
appropriate Erosion and Sediment control devises and a detailed Erosion & Sediment
Control Plan are implemented throughout the site during construction.
This report has demonstrated that the design of the proposed development has taken all
necessary steps to adopt Water Sensitive Urban Design principals in full compliance of the
Queensland State Planning Policy (2013), the Environmental Protection (Water) Policy
1997, and The Australian Guidelines for Urban Stormwater Management (ANZECC 2000).
Stormwater Management Plans
Page 16 Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.