8. APP G. Engineering RFI Response

Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

            d) Hyder is maintaining the existing features of the site frontage along Eumundi Noosa Road. Two
               driveway access points will be provided as per the current state of the development, the existing
               access points have been shifted south to accommodate vehicle turning paths.

            e) The current access points will be removed and will be reinstated to normal concrete kerb and
               channel. The concrete footpath will be connected through and the remaining verge turfed.

            f)    It is anticipated that on-street parking would still be provided between the site entrances on
                  Eumundi Noosa Road. Demarcation of street parking is something that would be determined
                  during the operational works phase of the development. Hyder requests that this be conditioned
                  in the development permit.

            g) A preliminary review of the linemarking suggests that additional linemarking may be required
               along Eumundi Noosa Road and Lionel Donovan Drive to facilitate vehicle movement at the site
               entry/exit. Hyder requests that the information required in this Item is included in the operational
               works conditions, rather than provided at the development approval phase as it does not impact
               on the proposed use.


       Item 19 – Stormwater Inlet, Lionel Donovan Drive
       a) & b) Hyder proposes that the existing stormwater inlet structure in Lionel Donovan Drive has a
              trafficable manhole cover constructed over the line and that a new pit is constructed upstream
              in a nearby location on the stormwater line. The preliminary design has been provided in drawing
              SK01305.

            c) It is anticipated that the existing services, both above and underground, will not be affected by
               the works, and that the required covers will be maintained. Hyder requests that the information
               required in this Item is included in the operational works conditions, rather than provided at the
               development approval phase.

            d) As outlined in Item 18, the current 2.0m footpath will be extended along the site frontage of Lot
               31 SP170751 on Lionel Donovan Drive. This will provide continuous pedestrian access around
               the site.


       Item 25 – Existing Services
       A “Water and Sewer Connection” form has been submitted to Unity Water for assessment, application
       reference 2015003544. The water and sewer servicing strategy has been amended after discussions
       with Unity Water. It is now proposed to relocate the sewer reticulation main on Lot 31 SP1700751 clear
       of the proposed building envelope. This will involve abandoning the existing main and providing a new
       connection point between the rising sewer main and gravity sewer main downstream. It is now also
       proposed to provide a single water connection point for the site from Lionel Donovan Drive. Please refer
       to the updated Engineering Services Drawing (SK01700-AA007595-E) attached.


       Item 26 – Hydraulic and Water Quality
       Confirmed. The MUSIC model has been rerun with the rainfall data required by Noosa Council and the
       bioretention areas provided conform to the water quality requirements. A revised Stormwater Report
       (F002-AA007595-AAR-04) is enclosed.




f:\aa007595\a-correspondance\a0001-aa007595-aal-02 response to rfi.docx                                  Page 2
Log in to download the original file

8. APP G. Engineering RFI Response.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.