8. APP G. Engineering RFI Response
Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
d) Hyder is maintaining the existing features of the site frontage along Eumundi Noosa Road. Two
driveway access points will be provided as per the current state of the development, the existing
access points have been shifted south to accommodate vehicle turning paths.
e) The current access points will be removed and will be reinstated to normal concrete kerb and
channel. The concrete footpath will be connected through and the remaining verge turfed.
f) It is anticipated that on-street parking would still be provided between the site entrances on
Eumundi Noosa Road. Demarcation of street parking is something that would be determined
during the operational works phase of the development. Hyder requests that this be conditioned
in the development permit.
g) A preliminary review of the linemarking suggests that additional linemarking may be required
along Eumundi Noosa Road and Lionel Donovan Drive to facilitate vehicle movement at the site
entry/exit. Hyder requests that the information required in this Item is included in the operational
works conditions, rather than provided at the development approval phase as it does not impact
on the proposed use.
Item 19 – Stormwater Inlet, Lionel Donovan Drive
a) & b) Hyder proposes that the existing stormwater inlet structure in Lionel Donovan Drive has a
trafficable manhole cover constructed over the line and that a new pit is constructed upstream
in a nearby location on the stormwater line. The preliminary design has been provided in drawing
SK01305.
c) It is anticipated that the existing services, both above and underground, will not be affected by
the works, and that the required covers will be maintained. Hyder requests that the information
required in this Item is included in the operational works conditions, rather than provided at the
development approval phase.
d) As outlined in Item 18, the current 2.0m footpath will be extended along the site frontage of Lot
31 SP170751 on Lionel Donovan Drive. This will provide continuous pedestrian access around
the site.
Item 25 – Existing Services
A “Water and Sewer Connection” form has been submitted to Unity Water for assessment, application
reference 2015003544. The water and sewer servicing strategy has been amended after discussions
with Unity Water. It is now proposed to relocate the sewer reticulation main on Lot 31 SP1700751 clear
of the proposed building envelope. This will involve abandoning the existing main and providing a new
connection point between the rising sewer main and gravity sewer main downstream. It is now also
proposed to provide a single water connection point for the site from Lionel Donovan Drive. Please refer
to the updated Engineering Services Drawing (SK01700-AA007595-E) attached.
Item 26 – Hydraulic and Water Quality
Confirmed. The MUSIC model has been rerun with the rainfall data required by Noosa Council and the
bioretention areas provided conform to the water quality requirements. A revised Stormwater Report
(F002-AA007595-AAR-04) is enclosed.
f:\aa007595\a-correspondance\a0001-aa007595-aal-02 response to rfi.docx Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.