8. APP G. Engineering RFI Response
Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
Item 27 – Bioretention Basin
Confirmed. The stormwater management strategy has been amended to provide separate bioretention
and retention systems. This removes the need for retaining walls, as batters will be provided near the
bioretention areas. The design of this system is in accordance with the Water by Design Technical
Design Guidelines. The revised basin location also allows for maintenance access from the paved areas
of the development, refer to the amended drawings for further detail.
Item 28 – Water Tanks
Confirmed. The development now proposes to include an underground water tank for detention
purposes on site, in addition to the bioretention basin for stormwater quality treatment. Part of the
detention tank volume is dedicated to stormwater retention and harvesting. By making provision for an
onsite stormwater retention/ harvesting, the proposed design complies with Outcome 3 of the Waster
Sensitive Design Code of the Noosa Plan. Additionally, detailed sections of the stormwater system have
been added to clarify its function.
Item 29 – Detention Storage
The design has been amended to provide for separate bioretention and detention systems. The outlet
arrangement has also been amended to reflect the change in stormwater strategy on site. Please refer
to SK1305 and SK1306 for further information.
Item 30 – Flood Detention
The design has been amended to provide for separate bioretention and detention systems. This allows
for sufficient depth of the underdrainage to drain from the bioretention basin into the detention tank. The
three existing legal points of discharge are being maintained in the developed state. Overland flow and
surcharge from the pit in north of will be directed to the east.
Details of the drainage system are provided in SK1305 and SK1306.
Item 31 – Stormwater Drainage
The current flow regime of stormwater leaving the site will be maintained in the developed state. All
three legal points of discharge and overland flow paths will be maintained. With regards to stormwater
at the bioretention basin and detention tank, no overland flow will be directed towards Walter Hay Drive,
rather it will surcharge from the existing pit on Lot 31 SP170751 and flow to the east.
Item 32 – Stormwater Drainage
SK01305 and SK01306 have been amended to show the field survey of the existing stormwater
drainage system of the proposed development site. It can be seen that the secondary overland flowpaths
to Eumundi Noosa Road, Lionel Donovan Drive and east of Lot 31 SP170751 will be maintained in the
developed state.
Item 33 – Erosion and Sediment Control (ES&C)
Erosion and sediment control measures will be included in the construction phase of the development,
and will be detailed in the Operational Works application drawings. Additionally, Hyder will be using the
bio-basin area in Lot 31SP170751 as a temporary sediment basin during construction, prior to
placement of sand filter. With regards to the months of construction identified, the exact start date is as-
yet unknown. The checklist has been revised to reflect 2 points for the construction month, which
provides greater flexibility for the project. Hyder expects that a detailed ES&C plan will be conditioned
in the development permit and provided at the time of the operational works application.
f:\aa007595\a-correspondance\a0001-aa007595-aal-02 response to rfi.docx Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.