8. APP G. Engineering RFI Response

Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 66, section 1. The text section number identifies this passage in the reader.

SCHEDULE 2—EROSION AND SEDIMENT CONTROL
ASSESSMENT

 

 

ti Preamble

Erosion and sediment control on building sites

Builders must not pollute the environment. The Environmental Protection Act provides for
penalties for persons or entities causing environmental harm.

Soil erosion on building sites can be a major source of sediment pollution (environmental
harm) in our watercourses. A single building site can lose up to four truckloads of soil in one
storm. Washed from the sites into stormwater drains, this sediment can cause flooding and
also affects the water quality and the fish stocks in our creeks, lakes and the Noosa River
system.

Preventing sediment run-off from building sites is one of a number of ways that Council and
industry are improving our watercourses,

Effective on-site erosion and sediment control provides the following benefits—

e A better looking, more marketable site;

e Improved wet weather working conditions;
e Reduced stockpile losses;

e Less mud and dust problems;

e Reduced clean-up costs;

e Fewer public complaints;

e Better public image:

e Cleaner watercourses; and

e Better fishing and swimming in our nearby watercourses.

 

yA Erosion Hazard Assessment Form

Controlling Factors odin) Re ierel gy Checking
Predominant slope of the whole site, prior to
building works:
e 0-3% slope

>3% - 5% slope

>5% - 10% slope

>10% - 15% slope

> 15% slope

aN =O

 

 

Sandy soil/gravel

e
°
e
e
Soil type: (see 1 below)
e
e Sandy loam

i"

 

 

 

 

 

' The term ‘predominant slope’ is defined in Part 2 Section 2.12.

$2.1

The Noosa Plan

Including amendments to 16 September 2013
Log in to download the original file

8. APP G. Engineering RFI Response.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.