8. APP G. Engineering RFI Response

Attached to the e-mail MCU14/0102 - Response to Information Request - Email 2 of 2..

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 67, section 1. The text section number identifies this passage in the reader.

The Noosa Plan

Ircluding amendments to 16 September 2013

Controlling Factors eye) Score Checking
e Clay loam 2
«Clay soil 2

 

Anticipated duration of site disturbance: (see 2 below)
e Duration < 2 weeks

e 2weeks # Duration <3 months

e¢ 3months # Duration <6 months

e Duration > 6 months

aaNO
~~,

 

Month that works are undertaken: (see 3 below)
e August, September

e April, May, June, July, November, October

« March December

e January February

wn +o
_

 

Offsite sediment control (i.e. down slope of the soil

disturbance):

« Score 1 point if there is no purpose built, operational 1
and well maintained sediment traps (eg. sediment
basin, gross pollutant trap or purpose built wetland) QO
to catch sediment before it enters a water body with
environmental values (eg. creek, natural wetland,
river or bay) (see 4 below)

 

Run-off entering the site:
e Score 1 point if stormwater run off entering the site is 1 O
not diverted away from the soil disturbance

 

Extent of site disturbance:
e Score 2 points if building work requires reshaping of

the ground surface (eg. ‘cut and fill’ works) (see 5 Z S
below)

*« Score 5 points if the area to be disturbed is greater >
than 600m?

 

Works within environmentally sensitive areas:
e Score 11 points if the disturbance is within the banks

 

 

 

 

 

 

of a watercourse (see 6 below) 11
e Score 5 points if the disturbance is within 50m of the O
top of bank of a watercourse 5
e Score 2 points if the disturbance is between 50m
and 100m of the top of bank of a watercourse 2
TOTAL SCORE (See 7 & 8 below) | Zz
Notes:

1. Where there is more than one type of soil on the site, select the category with the highest point value.

2. The time, from when the building site will first become vulnerable to erosion, to the time the soil will
be fully stabilised (eg. grassing).

3. If this time span covers more than one category, select the category with the highest point value.
Note that if there is no grass/vegetation cover on the site before building work has started, the time
span starts from the time this form is completed.

4. If you are not sure, score 1 point.

5. For the purpose of this form, ‘cut and fill’ works are those that will result in a steep batter or retaining
wall above and/or below the building slab, greater than 1 metre in height. If the building slab has
already been fully cut and stabilised (eg. grassed) during the subdivision stage, score 0 points.

6. Watercourse means any clearly identifiable creek, stream or river, whether flowing permanently or
intermittently.

7. Fora high risk site, the total score is > 14 points.

8. Fora lowrisk site, the total score is < 14 points.

$2.2

 
Log in to download the original file

8. APP G. Engineering RFI Response.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.