RFI - Attachment 4 - Traffic Impact Statement · MCU22/0094
Very large file (10.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 50, section 1. The text section number identifies this passage in the reader.
Road Design and Construction Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes Compliance Response
✓//NA
Road Design and Construction
PO10 AO10 N/A AO10 not applicable
Roads and pathways are planned and Road planning and design is in accordance Civil engineering design is beyond the scope of this
designed to support the function of with Council’s Planning Scheme Policy PSP6 traffic assessment.
the road hierarchy and ensure that— Engineering Design Standards – Roads,
drainage and earthworks.
(a) design and alignment of roads,
intersections and all associated
works —
(i) convey the primary function
of each type of street;
(ii) provide a safe environment
for all users;
(iii) are adequate for the design
speed environment;
(iv) are adequate for predicted
traffic volumes;
(v) maintains the safe and
efficient functioning of the
road network incorporating
roundabouts as a preference
to T intersections;
(vi) are compatible with existing
infrastructure;
(vii) are easily maintained by
Council equipment; and
(viii) where appropriate, have the
ability to accommodate public
transport services;
(b) road pavement surfaces —
(i) are durable enough to carry
estimated wheel loads of
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 4 - Traffic Impact Statement.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.