Engineering Operational Works Plans

Attached to the e-mail Application for operational works - 108 Black Mountain Range Road Black Mountain.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                      EROSION & SEDIMENT CONTROL
                                       INSTALLATION SEQUENCING
                                                                                                                                                                                                                                                                                            EROSION AND SEDIMENT CONTROL SEQUENCING
            INSTALLATION OF ENTRY / EXIT                                  DAY 1                                                                                                                                                                                                             ALL NOMINATED WORKS ARE TO BE STAGED SO THAT DISTURBED AREAS ARE KEPT TO A MINIMUM. EROSION AND SEDIMENT CONTROL MEASURES
                                                                                                                                                                                                                                                                                            SHALL BE IMPLEMENTED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE.
            INSTALLATION OF PERIMETER SEDIMENT FENCES                     DAY 1                                                                                                                                                                                                             ·      PROVIDE A STABILISED SITE ACCESS, INCLUDING SHAKE DOWN DEVICE AT THE CONSTRUCTION SITE ENTRANCE INCLUDING SILT FENCES AS
                                                                                                                                                                                                                                                                                                   REQUIRED.
            EXCAVATION OF SEDIMENT BASINS INCLUDING                       PRIOR TO STRIPPING
                                                                                                                                                                                                                                                                                            ·      ESTABLISH 'CLEAN WATER DIVERSION' OF UPSTREAM WATER AROUND PROPOSED DISTURBED AREAS AND STOCKPILES. THE CLEAN WATER
            INSTALLATION OF ENTRY CHUTES AND                              OF TOPSOIL AND                                                                                                                                                                                                           DIVERSION DRAINS TO BE STABILISED AS SPECIFIED.
            OVERFLOW STABILISATION                                        BULK EARTHWORKS
                                                                                                                                                                                                                                                                                            ·      'NO-GO' (RESTRICTED ACCESS) ZONES ARE TO BE ESTABLISHED. LAND OUTSIDE THE ESSENTIAL WORKS AREAS SHOULD REMAIN UNDISTURBED
                                                                                                                                                                                                                                                                                                   AND IN ITS NATURAL CONDITION
            INSTALL CUT-OFF DRAINS AND CHECK DAMS AS                      PRIOR TO STRIPPING
                                                                                                                                                                                                                                                                                            ·      SEDIMENT BASINS AND SEDIMENT TRAPS ARE TO BE CONSTRUCTED WITH APPROPRIATELY STABILISED DIVERSION STRUCTURES AND
            IDENTIFIED.                                                   OF TOPSOIL AND                                                                                                                                                                                                           EMERGENCY SPILLWAYS.
                                                                          BULK EARTHWORKS
                                                                                                                                                                                                                                                                                            ·      INSTALL SEDIMENT FENCES DOWNSTREAM OF ALL WORKS AREAS.
                                                                                                                                                                                                                                                                                            ·      STRIP TOPSOIL AND STOCKPILED FOR LATER USE ONSITE INCLUDING SILT FENCES DOWNSTREAM OF ALL TOPSOIL STOCKPILES.
            HOLD POINT                                                    SUPERVISING ENGINEER
                                                                                                                                                                                                                                                                                            ·      STABILISE ALL BATTER / EMBANKMENTS INCLUDING SILT FENCES AT THE TOE OF BATTERS.
                                                                          TO SIGN OFF
                                                                                                                                                                                                                                                                                            ·      ALL DISTURBED AREAS ARE TO BE PROGRESSIVELY STABILISED USING HYDROSEEDING.
            INSTALLATION OF EROSION AND SEDIMENT CONTROL                                                                                                                                                                                                                                    ·      INSTALL INLET TRAPS UPON COMPLETION OF DRAINAGE AND ROADWAORKS.
            MEASURES SUCH AS INLET PROTECTION, CHECK                                                                                                                                                                                                                                        ·      LAY TURF STRIPS ALONG CONCRETE FOOTPATHS AND BACK OF KERBS.
            DAMS, WINDROWS ETC AS IDENTIFIED ON THE ESC                                                                                                                                                                                                                                     ·      FINAL SITE LANDSCAPING IS TO BE CONDUCTED AS SOON AS POSSIBLE AFTER CONSTRUCTION COMPLETION.
            DRAWINGS AND AS DIRECTED ON SITE BY THE                                                                                                                                                                                                                                         ·      ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED AND MAINTAINED AS SPECIFIED.
            SUPERVISING ENGINEER.

                NOTE: EROSION AND SEDIMENT CONTROL MEASURES ARE TO REMAIN IN
                      PLACE AND MAINTAINED UNTIL 80% OF GROUNDCOVER IS ACHIEVED                                                                                                                                                                                                                                                                                     NOTE:
                      OR AS DIRECTED BY THE SUPERVISING ENGINEER.                                                                                                                                                                                                                                                                               THESE EROSION AND SEDIMENT CONTROL PLANS TO
                                                                                                                                                                                                                                                                                                                                                 BE READ IN CONJUNCTION WITH "BEST PRACTICE
                    NOTE:                                                                                                                                                                                                                                                                                                                        EROSION AND SEDIMENT CONTROL MANUAL 2008."
                    1. REFER TO DWG No. #### FOR EROSION & SEDIMENT CONTROL DETAILS.                                                                                                                                                                                                                                                            SITE INSPECTION FORMS & ITP'S FORM PART OF THIS
                                                                                                                                                                                                                                                                                                                                                      EROSION AND SEDIMENT CONTROL PLAN
       EROSION & SEDIMENT CONTROL NOTES
       1.     ALL EROSION & SEDIMENT CONTROL DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH                                                                                                                                                                                                                          THESE EROSION AND SEDIMENT CONTROL PLANS SHALL BE READ IN CONJUNCTION WITH:
              THE I E AUST SOIL EROSION & SEDIMENT CONTROL MANUAL, AS DETAILED ON THIS PLAN, OR                                                                                                                                                                                                                      "BEST PRACTICE EROSION AND SEDIMENT CONTROL MANUAL - 2008"
              AS REQUIRED FOR COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL                                                                                                                                                                                                                                  "BCC SEDIMENT BASIN DESIGN CONSTRUCTION AND MAINTENANCE GUIDELINES"
              MANAGEMENT PLAN.                                                                                                                                                                                                                                                                                       "IECA BEST PRACTICE DESIGN GUIDELINES" NOTABLY APPENDIX B, D, I & J

       2.     THE CONTRACTOR IS RESPONSIBLE FOR ENSURING SEDIMENT & EROSION CONTROL
              DEVICES ARE INSPECTED & MAINTAINED AS FOLLOWS:
              (A) DURING CONSTRUCTION
                  (i) DAILY DURING DRY WEATHER
                                                                                                                                                                                                                                                                                                               SEDIMENT CONTROL DEVICE CONSTRUCTION, MAINTENANCE AND
                  (ii) PRIOR TO PREDICTED STORM EVENTS
                                                                                                                                                                                                                                                                                                               REMOVAL IS TO BE IN ACCORDANCE WITH:
                  (iii) TWICE DAILY DURING PROLONGED RAIN
                                                                                                                                                                                                                                                                                                               ·  "BEST PRACTICE EROSION AND SEDIMENT CONTROL MANUAL - 2008"
                  (iv) DURING AND AFTER MAJOR STORM EVENTS
                                                                                                                                                                                                                                                                                                               ·  "BCC SEDIMENT BASIN DESIGN CONSTRUCTION AND MAINTENANCE
              (B) DURING DEFECTS LIABILITY PERIOD
                                                                                                                                                                                                                                                                                                                  GUIDELINES"
                  (i) WEEKLY DURING DRY WEATHER
                                                                                                                                                                                                                                                                                                               ·  BEST PRACTICE EROSION AND SEDIMENT CONTROL BOOK 6 -
                  (ii) PRIOR TO PREDICTED STORM EVENTS
                                                                                                                                                                                                                                                                                                                  STANDARD DRAWINGS IS TO BE REFERRED TO DURING
                  (iii) TWICE WEEKLY DURING PROLONGED RAIN
                                                                                                                                                                                                                                                                                                                  CONSTRUCTION.
                  (iv) DURING AND AFTER MAJOR STORM EVENTS

       3.      THE CONTRACTOR IS TO CONSTRUCT AN ENTRY/EXIT SEDIMENT TRAP AS DETAILED PRIOR
               TO THE COMMENCEMENT OF ANY EARTHWORKS.

       4.     ALL STOCKPILES TO BE TEMPORARILY GRASSED & GRADED TO ENSURE CONTROL OF
              RUNOFF. ALTERNATIVELY, SEDIMENT FENCES TO THE DOWNSTREAM FACE OF STOCKPILES
              ARE TO BE INSTALLED, WITH CUT-OFF DRAINS UPSTREAM.

       5.     ROUGHEN ALL SURFACES PRIOR TO TOPSOIL PLACEMENT. ROUGHENING TO CONSIST OF
              LATERAL (90° TO SLOPE) GROOVES 100mm DEEP AT 2m MAX. SPACINGS.

       6.     ALL EXPOSED SURFACES, ONCE COMPLETED SHALL BE IMMEDIATELY STABILISED TO
              PREVENT EROSION. ROUGHEN SURFACE BY FORMING LATERAL GROOVES 50mm DEEP AT 1m
              MAX. SPACINGS AND 5m MAX. LENGTHS.

       7.     SEDIMENT & EROSION CONTROL DEVICES (OTHER THAN THOSE ALREADY SHOWN) TO BE
              INSTALLED WHERE NECESSARY & AS DIRECTED ON SITE BY THE SUPERINTENDENT.

       8.     SEDIMENT & EROSION CONTROL DEVICES ON THIS PLAN ARE INDICATIVE ONLY. IT IS THE
              RESPONSIBILITY OF THE SITE MANAGER TO ENSURE THAT THE INTENT OF THIS PLAN AND
              THE ENVIRONMENTAL MANAGEMENT PLAN ARE COMPLIED WITH.

       9.     EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES TO BE COMPLETED PRIOR TO
              DISTURBANCE OF THE SITE, AND SHALL REMAIN IN PLACE UNTIL PERMANENT WORKS ARE
              COMPLETE AND CATCHMENT VEGETATION IS ESTABLISHED (75% GRASS COVER MINIMUM) .

       10. AREAS OF WORKS THAT REQUIRE DISTURBANCE OF SOIL SHALL BE KEPT TO A MINIMUM TO
           LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP IMPACT AND OTHER FORMS OF
           WIND/STORMWATER EROSION.

       11. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS STANDARD
           SPECIFICATION.



NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
                                                                                                               PURPOSES.
                                                                                                                       SWT                                                                                                                                                   PROJECT:                                                                            DRAWING TITLE:
                                                                                                                                                                                                                                        ALTA PROJECTS
                                                                                                              Drawn: SWT
                                                                                                                                                                                                                                        A.B.N. 611355330                                                                                                         EROSION AND SEDIEMNT CONTROL NOTES
                                                                              FOR APPROVAL                     Date: July 2020                                                                                                          26 Memorial Avenue, Cotton Tree      PROPOSED SUBDIVISION ESTATE
                                                                                    NOT FOR CONSTRUCTION                                                                                                                                PO Box 559, Cotton Tree, QLD, 4558                                                                                                                                  Revision       Sheet
                                                                                                            Checked:. . . . . . . . . . .
                                                                                                                                                                                                                                        Tel (07) 5475 4125 Fax (07) 5479 1607
                                                                                                                                                                                                                                        Email: [email protected]
                                                                                                                                                                                                                                                                             at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
                                                                                                                                                                                                                                                                                                                          DRAWING No:
                                                                                                                                                                                                                                                                                                                                      A6578/20/ES02                                                           B          2 of 3
                                                                                  STEPHEN ROBERTS
  B
  A
       31/08/2021
       16/08/2021
                     ISSUE FOR APPROVAL
                     ISSUE FOR APPROVAL
                                                                S.T.
                                                                S.T.
                                                                       S.R.
                                                                       S.R.
                                                                               .......................
                                                                                   DIRECTOR APPROVAL             Datum AHD
                                                                                                                                                                                                                                        Web: http://www.alta.net.au          for TOTAL CONCEPT HOMES
 REV    DATE                              DESCRIPTION           BY     CHKD        RPEQ - 7665                    A1 SHEET SIZE             FILENAME : A6578 - ES02 EROSION AND SEDIEMNT CONTROL NOTES.dwg - DATE : 31/8/21 - 2:15pm - XREF's: H-Approved-SR; H-Checked-SR                                                  Council Ref: ............
Log in to download the original file

Engineering Operational Works Plans.pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.