Engineering Operational Works Plans
Attached to the e-mail Application for operational works - 108 Black Mountain Range Road Black Mountain.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EROSION & SEDIMENT CONTROL MANAGEMENT PLAN
Comply with all statutory regulations and maintain the during earthworks Refer Best Practice Erosion and
Objective / Target construction. Comply with the Major Erosion and Sediment Control Plan Sediment Control Manual - Section
by Tate Professional Engineers to control erosion and sediment flows. 5 checklist
Site foreman to identify and check direction of stormwater flows as FLOW
shown on plan. Provide barriers and other measures shown on plan and Utilise B.P.& S.C. Manual
Management Strategy
within council guidelines to prevent stormwater flows over Inspection Form Section 7
embankments and minimise sediments into gully pits.
Implement and maintain control measures identified on the Erosion and Utilise Section 7 - B.P.& S.C.
Task / Actions
Sediment Control Plans. Manual checklist
ENTIRE VERGE TO
BE TURFED.
Site foreman to check for erosion and sediment flows at the base of
Utilise Section 7 - B.P.& S.C.
Performance Indicators embankments after rain. Check that all sediment fences and check
Manual checklist
dams are working correctly during rain events.
TYPICAL ANCHORAGE
Inspection of all control structures shall be undertaken prior to expected
rainfall events and at least twice weekly. All minor structures such as Refer drawing ESC01 for GEO LOG TO BE INSTALLED IN ACCORDANCE WITH IECA SEDIMENT AND
Frequency / Deadline
windrows, sediment fences etc, shall be inspected at the completion of frequency EROSION CONTROL DESIGN FACT SHEETS - INSTREAM PRACTICES
each day.
2%
Responsible Person / The implementation of the Major Erosion and Sediment Control Plan is Refer Erosion and Sediment
Organisation the responsibility of the Principal Contractor. Control Plan Section 6.0 4.25m
TURF VERGE DETAIL
Principal contractor to provide a monthly copy of record sheets SCALE: 1:50
Refer Erosion and Sediment
Reporting / Review identifying test results for water quality testing. Site workman to advise
Control Plan Section 6.0
foreman if they notice any barrier needing repair. PLAN
STAKING METHOD
Should inspection reveal deficiencies, the Contractor shall report issues NCR form to be utilised refer TYPICAL DETAIL
Corrective Actions
to Supervising Engineer. Section 7 - B.P.& S.C. Manual GEO-LOG (COIR LOGS)
SCALE 1:50
NOTE: A SAFE STORAGE LOCATION FOR FUELS AND OILS SHALL BE PROVIDED IN ACCORDANCE WITH AS1940 “THE STORAGE
AND HANDLING OF COMBUSTIBLE LIQUIDS”. THIS AREA SHALL BE BUNDED IN COMPLIANCE WITH THE STANDARD AND RELEVANT
REQUIREMENTS OF AUTHORITIES.
Construction Site ROCK CHECK DAMS SHALL BE LOCATED IN ALL CUT OFF DRAINS IN
5m Cattle grid 3.0m NOM width ACCORDANCE WITH IEAC STANDARD DRAWING RCD -01 SILT FENCE BY SEDIMENT FENCE LENGTH AS REQUIRED
MIN
MAX.
NOM
GEOFABRICS
700
set 300mm above ground BY GEOFABRICS
100
FORM U-SHAPED CREST TO
10 NOTE: ENSURE OVER TOPPING AT
MIN m 600mm CENTRE OF DAM N.S.L. N.S.L.
Contractor to provide a wash N.S.L.
down facilty in conjunction 150mm MIN
300
Geotextile fabric, 2 200 MIN
Bidum U34 or similar with the proposed cattle grid. 1
0.3m-0.5m 200 MIN
DIRECTION OF FLOW
3 m IN POSTS AT 3m CENTRES WITH WIRE
M To SECTION MESH BACKING or 2m WITHOUT. ALL
Ex EMBED 200mm
ter 150mm ROCK SPALLS
75 - 100mm nal INTO GROUND POSTS DRIVEN 600mm INTO GROUND.
CRUSHED ROCK Ro GEOTEXTILE
ad
FABRIC
ROCK CHECK DAM PERIMETER SILT FENCE
SCALE 1:50
CONSTRUCTION EXIT SCALE 1:50
SEDIMENT FENCES SHALL BE CONSTRUCTED WITH RETURNS AT
INTERVALS IN ACCORDANCE WITH "IECA BEST PRACTICE EROSION
CONTROL MANUAL" AND MAXIMUM 20m SPACINGS FOR FENCES
ALONG CONTOURS AND 10m FOR ON-GRADE.
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
SWT PROJECT: DRAWING TITLE:
ALTA PROJECTS
Drawn: SWT
A.B.N. 611355330 EROSION AND SEDIMENT CONTROL DETAILS
FOR APPROVAL Date: July 2020 26 Memorial Avenue, Cotton Tree PROPOSED SUBDIVISION ESTATE
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607
Email: [email protected]
at 108 BLACK MOUNTAIN RANGE ROAD, BLACK MOUNTAIN
DRAWING No:
A6578/20/ES03 B 3 of 3
STEPHEN ROBERTS
B
A
31/08/2021
16/08/2021
ISSUE FOR APPROVAL
ISSUE FOR APPROVAL
S.T.
S.T.
S.R.
S.R.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for TOTAL CONCEPT HOMES
REV DATE DESCRIPTION BY CHKD RPEQ - 7665 A1 SHEET SIZE FILENAME : A6578 - ES03 EROSION AND SEDIMENT CONTROL DETAILS.dwg - DATE : 31/8/21 - 2:14pm - XREF's: H-Approved-SR; H-Checked-SR Council Ref: ............
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.