Original source · versioned page text
Appendix B - Code Assessment
Noosa Plan 2020: Amendment 3
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.2 Biodiversity, Waterways and Wetlands
Overlay Code
(f) where offsets are necessary, delivering offsets
that support and enhance ecological linkages.
Waterways and wetlands
PO6 AO6.1 AO6.1 – Complies with Overall Outcomes
The biodiversity and ecosystem values of waterways, Development and clearing of vegetation does not
wetlands and adjacent riparian zones are protected by: occur within: The proposal does not involve buildings, structures
(a) avoiding any new development in a riparian (a) a riparian buffer area; or vegetation clearing within a mapped riparian
buffer area and wetland area; (b) a wetland area; or buffer area. However, a small portion of the common
(b) retaining aquatic and terrestrial habitat in riparian (c) 10 metres either side of the centre line of other boundary between proposed Lots 1 and 2 traverses
zones; waterways identified on a Biodiversity, the outer extent of a mapped riparian buffer
(c) maintaining and enhancing wildlife corridors and Waterways and Wetlands Overlay Map. associated with a first order stream. The proposed
connectivity along watercourses and drainage boundary is located approximately 41.6m from the
lines for native fauna movement; associated waterway, which presents as a grassed
(d) avoiding edge effects and damage from adjacent AO6.2 gully line in this location.
land uses; Development provides for the rehabilitation of land
(e) maintaining stream integrity and bank stability by within: In addition, the common boundary between
minimising bank erosion and slumping; (a) a riparian buffer area; proposed Lots 3 and 4 crosses a mapped waterway.
(f) maintaining water quality through filtering (b) a wetland area; and However, this boundary follows an existing farm
sediments, nutrients and other pollutants; and (c) 10 metres either side of the centre line of any fence line.
(g) removing pest species and replacing them with other waterway identified on a Biodiversity,
local native species. Waterways and Wetlands Overlay Map. Despite the technical non-compliance with AO6.1,
the proposal is considered to comply with the
relevant Overall Outcomes of the code, including
Overall Outcomes 2(b), 2(c), 2(d) and 2(e), for the
following reasons:
AO6.3
Recreational facilities (eg. playgrounds, pergolas, (a) the development has been designed and sited
barbeques) are setback a minimum of 10 metres from in a way that avoids adverse impacts on
the top of the bank of a waterway. ecologically important areas, ecological systems
Editor’s Note—Setbacks to waterways for certain uses and and processes, in that:
works are also specified in the relevant codes. i. the common boundary between proposed
Editor's Note—Wetland areas are identified on the Lots 1 and 2 is located through a cleared
Queensland Wetland Program mapping paddock and is approximately 41.6m from
Editor's Note—Any clearing of vegetation also needs to the associated waterway. The boundary will
meet the outcomes of the Earthworks Code and the Water not result in any buildings, structures or
Quality and Drainage Code. vegetation clearing within the riparian zone
Print Date: 23/03/2026 Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original