Attachment 3 - Response Letter

of 6

Page text shows just the words. Original shows the document exactly as it was published.

        (c) to take into account the need to protect environmental values and water
        quality of receiving waters both during and post construction - the sediment
        fences will be installed prior to construction and removed once the land has
        been stabilized. (PO1);


2. The stormwater drainage infrastructure is planned and designed to be constructed
  to:


  (a) incorporate allowance for increased flood risk and tidal inundation through
  pipework as a result of climate change and sea level rise – This is irrelevant to the
  development in question as there no public pipe work, and the site in question,
  based on the survey is approximately 34m above AHD.


  (b) ensure the development is adequately drained; - As indicated in drawing 3951-
  A100D the levels shown, indicate there is an approximately a 5m fall across the
  subject lot towards the existing kerb and channel.


  (c) ensure stormwater is managed and lawfully discharged without altering
  stormwater drainage characteristics external to the site, in this case the
  stormwater drains running along Ventura Street (PO2).


3. The stormwater drainage infrastructure conveys run-off in a manner that allows
  roads to deliver desired standards of service appropriate to the local conditions
  and local stormwater drainage characteristics (PO3) – The stormwater captured in
  a peak event is stored and released in a controlled manner replicating the pre
  development flow conditions.


4. The stormwater infrastructure is compatible with existing infrastructure, allows for
  easy access for the ongoing maintenance by Council, and ought to be cost
  effective across its design life (PO4).


5. The stormwater drainage does not cross waterways and is not located near,
  wetlands, drainage lines and ecological important areas, or where it is
  demonstrated this is unavoidable, disturbed areas are reinstated and revegetated
  upon completion of works (PO5).


6. Sediment barriers are to be used to prevent sediment washing into gutters (PO14).
Log in to download the original file

Attachment 3 - Response Letter.pdf · 126 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.